City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
TIC 2017-03-28 Item 2E - Grant Applications - Bridge Repalcement Advisory Committee
COT-City
>
City Clerk
>
Council Committees
>
Transportation and Infrastructure (2017-2020)
>
Transportation and Infrastructure Agenda Packets (2017-Present)
>
2017-03-28 Transportation and Infrastructure
>
TIC 2017-03-28 Item 2E - Grant Applications - Bridge Repalcement Advisory Committee
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2021 12:29:47 PM
Creation date
3/23/2017 1:19:14 PM
Metadata
Fields
Template:
Council Committees
Committees Date (mm/dd/yy)
03/28/17
Committee Name
Transportation and Infrastructure 2017-2020
Record Type
Agenda Packet
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of Tukwila Allan Ekberg, Mayor <br />Public Works Department -Bob Giberson Director <br />Transportation and Infrastructure Committee <br />BobGibemamn, Public Works Director -M <br />Steve Carstens, Senior Program Manager <br />Mayor Ekberg <br />March 24, 2017 <br />SUBJECT:,Bridge Replacement Advisory Committee (BRAC) Applications <br />ISSUE <br />Authorize the submittal of grant application(s) for funding from the Federal Highway Bridge (BRAC) <br />BACKGROUND <br />The Washington State Department of Transportation has issued 8 Call for Projects to compete for <br />approximately $8O million UfBRACfunding. Tukwila currently has only two (2) bridges that qualify for <br />funding during this call. The Boeing Access Road Bridge over Airport Way is structurally deficient and <br />iS not seismically protected. -[h842» « Avenue South Bridge over the [}UYV8DliSh River iSstructurally <br />deficient and is eligible for [ep|8C8Dl8DL Neither project iGCU[[8Dt|yprOgr8[DOO8d iO the City's 6-ye8[ <br />T[8DSpOrt8dOD Improvement Program /UP\O[ the Capital Improvement Program (C|P). <br />DISCUSSION <br />Grant applications are due bv April 3.2O17. <br />• Apre|i0iDary grant application totaling $12'330,00 has been prepared for the <br />42 ndAveDUe South Bridge. The Call for Projects indicates that 20%iOmatching design and <br />construction funds should be assumed for this project, RDdm0U|dn3qUir8S2.330.00OiD|OC8| <br />matching funds. <br />• A preliminary grant application totaling (8pp[0xinm8t8|«)$2'323,OOO has been prepared for the <br />Boeing Access Road Bridge. The Call for Projects iDdiC8t8Sth8i2Oq6iD0GtChiDgdeSi funds <br />should b8 assumed for the project, and would require approximately $120,000 in local matching <br />funds. <br />The grant applications assume the construction start date would b8 anticipated [O begin iO2O2Ofor <br />each project. <br />RECOMMENDATION <br />Discuss the decision tO authorize the submittal Of@ grant application fO[dl888iS0iCUpg[8deOfth8 <br />Boeing Access Road Bridge and/or replacement of the 42 nd Avenue South Bridge. Staff is requesting <br />Transportation Infrastructure Committee provide direction and approval to pursue the grant <br />Attachments: BRAC Call for Projects <br />vv:\pW RW&RS Pnojocm\Bhuga Inspection pmgmmu\BnUga Inspections xn17(91o1n4ns)\2n17BRAC\2o1r*neninfo <br />BRAC memo TIC sm.docx <br />6300 + 6300Southcen ter Boulevard Suite I00 ^ Tukwila, N<A98289 206'433'0179 <br />Tukwila City Hall ^G200 Southcenter Boulevard ^Tukwila, WA 98188^206-433-1800 "Website: TukwilaWA.gop <br />67 <br />
The URL can be used to link to this page
Your browser does not support the video tag.