Laserfiche WebLink
City of Tukwila Allan Ekberg, Mayor <br />Public Works Department -Bob Giberson Director <br />Transportation and Infrastructure Committee <br />BobGibemamn, Public Works Director -M <br />Steve Carstens, Senior Program Manager <br />Mayor Ekberg <br />March 24, 2017 <br />SUBJECT:,Bridge Replacement Advisory Committee (BRAC) Applications <br />ISSUE <br />Authorize the submittal of grant application(s) for funding from the Federal Highway Bridge (BRAC) <br />BACKGROUND <br />The Washington State Department of Transportation has issued 8 Call for Projects to compete for <br />approximately $8O million UfBRACfunding. Tukwila currently has only two (2) bridges that qualify for <br />funding during this call. The Boeing Access Road Bridge over Airport Way is structurally deficient and <br />iS not seismically protected. -[h842» « Avenue South Bridge over the [}UYV8DliSh River iSstructurally <br />deficient and is eligible for [ep|8C8Dl8DL Neither project iGCU[[8Dt|yprOgr8[DOO8d iO the City's 6-ye8[ <br />T[8DSpOrt8dOD Improvement Program /UP\O[ the Capital Improvement Program (C|P). <br />DISCUSSION <br />Grant applications are due bv April 3.2O17. <br />• Apre|i0iDary grant application totaling $12'330,00 has been prepared for the <br />42 ndAveDUe South Bridge. The Call for Projects indicates that 20%iOmatching design and <br />construction funds should be assumed for this project, RDdm0U|dn3qUir8S2.330.00OiD|OC8| <br />matching funds. <br />• A preliminary grant application totaling (8pp[0xinm8t8|«)$2'323,OOO has been prepared for the <br />Boeing Access Road Bridge. The Call for Projects iDdiC8t8Sth8i2Oq6iD0GtChiDgdeSi funds <br />should b8 assumed for the project, and would require approximately $120,000 in local matching <br />funds. <br />The grant applications assume the construction start date would b8 anticipated [O begin iO2O2Ofor <br />each project. <br />RECOMMENDATION <br />Discuss the decision tO authorize the submittal Of@ grant application fO[dl888iS0iCUpg[8deOfth8 <br />Boeing Access Road Bridge and/or replacement of the 42 nd Avenue South Bridge. Staff is requesting <br />Transportation Infrastructure Committee provide direction and approval to pursue the grant <br />Attachments: BRAC Call for Projects <br />vv:\pW RW&RS Pnojocm\Bhuga Inspection pmgmmu\BnUga Inspections xn17(91o1n4ns)\2n17BRAC\2o1r*neninfo <br />BRAC memo TIC sm.docx <br />6300 + 6300Southcen ter Boulevard Suite I00 ^ Tukwila, N<A98289 206'433'0179 <br />Tukwila City Hall ^G200 Southcenter Boulevard ^Tukwila, WA 98188^206-433-1800 "Website: TukwilaWA.gop <br />67 <br />