City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
TIC 2017-04-11 COMPLETE AGENDA PACKET
COT-City
>
City Clerk
>
Council Committees
>
Transportation and Infrastructure (2017-2020)
>
Transportation and Infrastructure Agenda Packets (2017-Present)
>
2017-04-11 Transportation and Infrastructure
>
TIC 2017-04-11 COMPLETE AGENDA PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2021 12:29:47 PM
Creation date
4/6/2017 3:22:51 PM
Metadata
Fields
Template:
Council Committees
Committees Date (mm/dd/yy)
04/11/17
Committee Name
Transportation and Infrastructure 2017-2020
Record Type
Agenda Packet
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
EXHIBITA <br />project site, and will observe the technical progress of the construction, including <br />providing day -to -day contact with the Contractor and the City: <br />• Preparation to include mobilization and clearing and grubbing <br />• Erosion Control <br />• HMA grinding and paving <br />• Driveways, curb, gutter and sidewalk <br />• And all incidental items necessary to complete the Work as described in the Plans <br />and /or Specifications. <br />Field inspection staff will perform the following duties as a matter of their daily activities: <br />Observe technical conduct of the construction, including providing day -to -day contact <br />with construction contractor, City, utilities, and other stakeholders, and monitor for <br />adherence to the Contract Documents. The Consultant's personnel will act in <br />accordance with Sections 1 -05.1 and 1 -05.2 of the Standard Specifications. <br />ii. Observe material, workmanship, and construction areas for compliance with the <br />Contract Documents and applicable codes, and notify construction contractor of <br />noncompliance. Advise the City of any non - conforming work observed during site visits. <br />iii. Document all material delivered to the job site in accordance with the contract <br />documents. <br />iv. Prepare daily inspection reports, recording the construction contractor's operations as <br />actually observed by the Consultant; includes quantities of work placed that day, <br />contractor's equipment and crews, and other pertinent information. <br />V. Interpret Contract Documents in coordination with the City and KPG. <br />vi. Resolve questions which may arise as to the quality and acceptability of material <br />furnished, work performed, and rate of progress of work performed by the construction <br />contractor. <br />Vii. Establish communications with adjacent property owners. Respond to questions from <br />property owners and the general public. <br />viii. Coordinate with permit holders on the Project to monitor compliance with approved <br />permits, if applicable. <br />ix. Prepare field records and documents to help assure the Project is administered in <br />accordance with the funding requirements. <br />X. Collect and calculate delivery tickets and salesman's daily reports of aggregate. All tickets <br />will be initialed with correct bid item and stationing identified (Construction Manual <br />10 -2). <br />xi. Attend and actively participate in regular on -site weekly construction meetings. <br />xii. Take periodic digital photographs during the course of construction, and record <br />locations. <br />xiii. Coordinate with the City's maintenance personnel. <br />xiv. Punch list. Upon substantial completion of work, coordinate with the Client and affected <br />agencies, to prepare a 'punch list' of items to be completed or corrected. Coordinate <br />Cascade View SRTS — Phase 2 Page 3 of 8 KPH <br />Construction Management Services 113117 <br />0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.