City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
TIC 2017-04-11 COMPLETE AGENDA PACKET
COT-City
>
City Clerk
>
Council Committees
>
Transportation and Infrastructure (2017-2020)
>
Transportation and Infrastructure Agenda Packets (2017-Present)
>
2017-04-11 Transportation and Infrastructure
>
TIC 2017-04-11 COMPLETE AGENDA PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2021 12:29:47 PM
Creation date
4/6/2017 3:22:51 PM
Metadata
Fields
Template:
Council Committees
Committees Date (mm/dd/yy)
04/11/17
Committee Name
Transportation and Infrastructure 2017-2020
Record Type
Agenda Packet
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of Tukwila <br />Allan Ekberg, Mayor <br />TO: <br />Transportation and Infrastructure Committe <br />FROM: <br />Bob Giberson, Public Works Director <br />BY: <br />David Sorensen, Project Manager <br />CC: <br />Mayor Ekberg <br />DATE: <br />April 7, 2017 <br />SUBJECT: Cascade View Safe Routes to School Phase 11 <br />Project No. 91510302, Contract No. 16 -023 <br />Supplemental Agreement No. 2 for Construction Management Services <br />ISSUE <br />Execute Supplemental Agreement No. 2 with KPG, Inc. to provide construction management services for the <br />Cascade View Safe Routes to School Phase II Project. <br />FI-_ .r;• ►o <br />In September 2015, the City was awarded a federal grant as part of the Safe Routes to School Program that is to be <br />used for Cascade View Elementary School Phase II. The project will provide construction of a roundabout at 33rd Ave <br />S/S 1401h St and sidewalks on the east side of 331d Ave S between S 140th St and S 1441h St and the south side of S <br />1401h St between Military Rd S and 341h Ave S. <br />DISCUSSION <br />On February 16, 2016 the Council approved the contract with KPG to provide engineering design services for the <br />project. KPG was selected to also provide construction management services as a supplement to the design <br />contract. <br />FINANCIAL IMPACT <br />KPG has prepared the attached contract, scope of work, and fee estimate to provide the necessary construction <br />management services for the Cascade View Safe Routes to School Phase II Project. The 2017 CIP has $140,000 <br />budgeted for construction management, but the estimated costs completed with the grant application are not <br />sufficient to cover the updated cost estimates. As the project includes roadway and surface water improvements, <br />additional budget will come from those two projects. The construction cost estimates are also higher than anticipated <br />and funds may also be needed for the construction award. <br />Contract Budget <br />KPG Supplement Agreement No. 2, Construction Mgmt $180,387.80 $140,000.00 <br />2017 Overlay /2017 Small Drainage Programs 40,387.80 <br />Total $180,387.80 180 ,387.80 <br />RECOMMENDATION <br />Council is being asked to approve Supplemental Agreement No. 2 with KPG, Inc. in the amount of $180,387.80 for <br />construction management services of the Cascade View Safe Routes to School Phase II Project and consider this <br />item at the April 24, 2017 Committee of the Whole Meeting and subsequent May 1, 2017 Regular Meeting. <br />attachments: Vicinity Map <br />Page 4, 2017 CIP sheet <br />Supplemental Agreement No. 2 <br />WAPW Eng\PROJECTSW RW & RS Projects\Safe Routes to School - Cascade View Phase 11 (91510302) \Construction ManagementTocs to TIC \Info Memo KPG Supp #2r CM 040717.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.