Laserfiche WebLink
4.7 Permit Support <br />Otak will provide support to the City for communications with state and federal permitting and <br />regulatory agencies, as well as any interested tribal representatives, for the duration of the project. <br />This task includes addressing all comments and answering questions concerning environmental <br />documentation and permit application materials. <br />Deliverables: <br />1. List of all permits, environmental review and special studies required to finalize design and <br />construct this project. <br />2. Field meeting summary memorandum for each one (Electronic PDF). <br />3. One draft and one final Critical Areas Report (Electronic Microsoft Word and PDF, and hard <br />paper copies as needed by each permit). <br />4. One draft and one final of Joint Aquatic Resources Permit Application (DARPA) supporting <br />drawings (Electronic PDF, and hard paper copies as needed by each permit). <br />5. One draft and one final of Specific Project Information Form (SPIF) (Electronic Microsoft <br />Word and PDF, and hard paper copies as needed by each permit). <br />6. Application (NOI) for Ecology Construction Stormwater General Permit submitted on -line. <br />SWPPP submitted to the City. <br />7. One draft and final application package for each permit and environmental review (Electronic <br />PDF and hard paper copies as needed by each permit). <br />Assumptions: <br />1. The City will be the main point of contact with the permitting agencies. <br />2. This task does not include geotechnical exploration and analysis. <br />3. The Critical Areas Report for this task includes wetlands, streams and other fish and wildlife <br />habitat conservation areas, and will not include information and analysis associated with <br />frequently flooded areas, geologically hazardous areas, and /or aquifer recharge areas. <br />4. The project will be designed and qualify as a Fish Enhancement Project and will receive a <br />streamlined Hydraulic Project Approval (HPA), per Regulatory Code of Washington RCW <br />77.55.181 and Washington State Department of Fish and Wildlife. <br />5. As a Fish Enhancement Project, the project will be exempted from the requirements of SEPA, <br />and no SEPA environmental checklist will be prepared as part of this scope. If SEPA is <br />required, then the City will prepare the SEPA documents based on design documents prepared <br />by Otak under the tasks in the approved scope of services. <br />6. The project may require local (City of Tukwila) permits, including critical areas ordinance <br />compliance, shoreline permits, flood hazard permits, and other relevant local permits. <br />Applications and support documentation for local permits will not be prepared as part of this <br />scope, if required, Tukwila will complete and submit the required local permit applications. <br />31 <br />