City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
TIC 2017-04-11 COMPLETE AGENDA PACKET
COT-City
>
City Clerk
>
Council Committees
>
Transportation and Infrastructure (2017-2020)
>
Transportation and Infrastructure Agenda Packets (2017-Present)
>
2017-04-11 Transportation and Infrastructure
>
TIC 2017-04-11 COMPLETE AGENDA PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2021 12:29:47 PM
Creation date
4/6/2017 3:22:51 PM
Metadata
Fields
Template:
Council Committees
Committees Date (mm/dd/yy)
04/11/17
Committee Name
Transportation and Infrastructure 2017-2020
Record Type
Agenda Packet
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF TUKWILA CAPITAL PROJECT SUMMARY <br />2017 to 2022 <br />PROJECT: <br />Cascade View Safe Routes to School Phase II Project No. 91510302 <br />Phase II <br />91210301 <br />Construct an off - street, paved shared use path, sidewalks, and a traffic circle at 33rd Ave S and S 140th St. <br />DESCRIPTION: <br />This route was identified in the Walking Audit prepared for the Cascade View school zone. S 140th St is one <br />of the high priority missing sidewalk areas prioritized as part of the Walk and Roll Plan. <br />Enhance safety for students walking to Cascade View Elementary School and encourage transportation choices <br />JUSTIFICATION: <br />for Cascade View neighborhood residents. <br />STATUS: <br />Phase I completed an off - street, paved shared use path between S 137th St and S 140th St in 2015 (91210301). <br />Phase 11 includes a traffic circle at 33rd Ave S/S 140th St. Also includes sidewalks on the east side of 33rd Ave S <br />between S 140th St & S 144th St and the south side of S 140th St between Military Rd S and 34th Ave S. <br />MAINT. IMPACT: <br />New trail, traffic circle, sidewalks, and drainage will need to be maintained. <br />Land(R/W) <br />Phase II WSDOT Safe Routes to School Federal grant for $839K. Mitigation of $37k from Orcas Homes. <br />COMMENT: <br />Phase I included a WSDOT Safe Routes to School State grant for $428K. <br />FINANCIAL <br />Through Estimated <br />fin Snnn'31 <br />2n15 2n1R 2n17 9n1R 2n19 9n9n 9nol 9n99 RFvnMn TnTAI <br />EXPENSES <br />Phase I <br />Phase II <br />Phase II <br />Design <br />84 <br />125 <br />20 <br />229 <br />Land(R/W) <br />65 <br />65 <br />Const . Mgmt. <br />89 <br />140 <br />229 <br />Construction <br />310 <br />654 <br />964 <br />TOTAL EXPENSES <br />548 <br />125 <br />1 8141 <br />01 <br />0 <br />0 <br />0 <br />0 <br />0 <br />1,487 <br />FUND SOURCES <br />Awarded Grant <br />404 <br />125 <br />714 <br />1,243 <br />School District Grani <br />22 <br />22 <br />Proposed Grant <br />0 <br />Mitigation <br />37 <br />37 <br />City Oper. Revenue <br />122 <br />(7) <br />100 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />185 <br />TOTAL SOURCES <br />548 <br />125 <br />814 <br />0 1 <br />0 <br />0 <br />0 <br />0 <br />0 <br />1,487 <br />2017 - 2022 Capital Improvement Program 4 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.