City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
TIC 2017-04-11 COMPLETE AGENDA PACKET
COT-City
>
City Clerk
>
Council Committees
>
Transportation and Infrastructure (2017-2020)
>
Transportation and Infrastructure Agenda Packets (2017-Present)
>
2017-04-11 Transportation and Infrastructure
>
TIC 2017-04-11 COMPLETE AGENDA PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2021 12:29:47 PM
Creation date
4/6/2017 3:22:51 PM
Metadata
Fields
Template:
Council Committees
Committees Date (mm/dd/yy)
04/11/17
Committee Name
Transportation and Infrastructure 2017-2020
Record Type
Agenda Packet
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
•• We 110421 <br />January 3, 2017 <br />City ®f Tukwila <br />Cascade View SRTS — Phase 2 <br />This work will provide construction management services for the construction contract to complete the <br />City of Tukwila Cascade View SRTS — Phase 2 project. These services will include design support, project <br />management, documentation control, inspection, materials testing, public involvement, and contract <br />administration during the construction of the project, as detailed below. KPG ( "Consultant ") will provide <br />to the City of Tukwila ( "City ") construction management services for the project. <br />A detailed scope for the Contract follows: <br />The following scope of services and associated costs are based upon the assumptions outlined below. <br />General Assumptions: <br />• The proposed project team will include one part -time documentation control specialist, a part - <br />time resident engineer during construction activities, a full -time inspector, sub - consultants to <br />provide services for materials testing, and other supporting tasks as deemed necessary. It is <br />anticipated that full- time site observation will be required for the entirety of the project. <br />• The level of service is based on a construction project duration of approximately 80 working <br />days. <br />• KPG estimates a total project duration of 115 working days (23 weeks) including preconstruction <br />service, construction services, and project closeout. No suspensions or stop work periods are <br />anticipated during this duration. <br />• It is anticipated that the KPG will update and modify the Record of Materials (ROM) . This scope <br />of services provides the management of the ROM and scheduling of required materials testing <br />respectively. <br />• It is anticipated that the City will review and execute the insurance, bonds, and the Construction <br />Contract. <br />• KPG will do all public outreach, and ensure affected residents are notified of impending contractor <br />activities by door to door and or A -board signs that include date, hours of work, and a KPG staff <br />phone number to call for questions. <br />• The design engineers from KPG will be available during construction to answer questions during <br />Cascade View SRTS — Phase 2 Page 1 of 8 KPG <br />Construction Management Services 113117 <br />9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.