City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
FIN 2017-04-18 COMPLETE AGENDA PACKET
COT-City
>
City Clerk
>
Council Committees
>
Finance (2017-2020)
>
Finance Agenda Packets (2017-Present)
>
2017-04-18 Finance
>
FIN 2017-04-18 COMPLETE AGENDA PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2021 12:13:11 PM
Creation date
4/13/2017 11:36:42 AM
Metadata
Fields
Template:
Council Committees
Committees Date (mm/dd/yy)
04/18/17
Committee Name
Finance 2017-2020
Record Type
Agenda Packet
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF TUKWILA CAPITAL PROJECT SUMMARY <br />2017 to 2022 <br />PROJECT: 53rd Ave S (S 137th St - S 144th St) Project No. 99110301 <br />DESCRIPTION: Design and construct urban residential street improvements that include curb, gutter, sidewalk, undergrounding, <br />and illumination. Street will coordinate with Water $1.1 m, Sewer $185k, and Surface Water $920k CIP projects. <br />JUSTIFICATION: Provide pedestrian and vehicle safety, drainage, and neighborhood revitalization, <br />STATUS: Undergrounding is included at this time. <br />MAINT. IMPACT: Reduce pavement shoulder, and drainage work. <br />State TIB grant for $2.14M for roadway and drainage.. See additional pages in Enterprise funds under <br />COMMENT: 53rd Ave S Projects. Seattle City Light is now negotiating a 60/40 underground split and undergrounding <br />costs have been added to project. Bond for $2 million. <br />FINANCIAL Through Estimated <br />tin Snnn'Ri 21)15 211118 2017 2(1111 2n19 2n2n qn?i 7n77 Rs=vnun TATA I <br />EXPENSES <br />Design <br />83 <br />107 <br />3 <br />193 <br />Land (R/W) <br />2 <br />98 <br />100 <br />Const. Mgmt. <br />435 <br />435 <br />870 <br />Construction <br />1,050 <br />1,050 <br />2,100 <br />Undergrounding <br />1,125 <br />1,125 <br />2,250 <br />TOTAL EXPENSES <br />85 <br />1 206 <br />2,613 <br />2,610 <br />1 0 <br />01 <br />01 <br />0 <br />0 <br />5,513 <br />FUND SOURCES <br />Utilities W/S/SWM <br />25 <br />25 <br />Awarded TIB Grant <br />900 <br />900 <br />Remainder <br />of grant in <br />SWM <br />1,800 <br />Seattle City Light <br />675 <br />675 <br />1,350 <br />Bond <br />1,000 <br />1,000 <br />CEO(�—O- <br />City Oper. Revenue <br />60 <br />205 <br />38 <br />35 <br />0 <br />0 <br />0 <br />0 <br />0 <br />338 <br />TOTAL SOURCES <br />85 <br />205 <br />2,613 <br />2,610 <br />0 <br />0 <br />0 <br />01 <br />01 <br />5,613 <br />2017 - 2022 Capital Improvement Program 3 <br />A <br />
The URL can be used to link to this page
Your browser does not support the video tag.