Laserfiche WebLink
CITY OF TUKWILA CAPITAL PROJECT SUMMARY <br />2017 to 2022 <br />PROJECT: Public Works Shops Project No. 91630601 <br />DESCRIPTION: Construct a new City Public Works maintenance and operations center, combining all operational functions <br />at one location. Facility may also include a City Clerk & Police Records Center and Police evidence storage. <br />Existing Public Works operations and maintenance areas are inadequate structurally and seismically. Current <br />JUSTIFICATION: land for staging dirt and vactor materials is only temporary. Project includes selling dirt/vactor land, Minkler Shops, <br />and George Long Shops to acquire the real estate to build an equipment operations center that meets current <br />codes. <br />STATUS: Separate from the Public Safety Plan. Was formerly known as City Maintenance Facility. <br />MAINT. IMPACT: Improves safety and efficiency for First Responders and maintenance operations. <br />COMMENT: Based on usage and benefits, it is estimated that the Water, Sewer, and Surface water enterprise 1unds will <br />fund 50% of the Public Works Shops with the other 50% funded by Streets, Facilities, & Equipment Rental. <br />FINANCIAL Through Estimated <br />tin 4tnnn'a1 2n1-r. 2n1 9 2n47 2nin 2nia 2n2n 2n24 M22 RF:vnmn TnTAI <br />EXPENSES <br />Design/PM <br />150 <br />2,302 <br />100 <br />2,552 <br />Land (R/W) <br />6,000 <br />6,000 <br />Const. Mgmt. <br />0 <br />Construction <br />20,941 <br />20,941 <br />TOTAL EXPENSES <br />01 <br />0 <br />6,150 <br />2,302 <br />21,041 <br />0 <br />0 <br />0 <br />0 <br />29,493 <br />FUND SOURCES <br />Enterprise Funds <br />14,746 <br />14,746 <br />Councilmatic Bond <br />14,747 <br />14,747 <br />Proposed Sale of Land <br />5,000 <br />5,000 <br />Mitigation Expected <br />0 <br />City Ciper. Revenue <br />0 <br />0 <br />(23,343) <br />2,302 <br />21,041 <br />(5,000) <br />0 <br />0 <br />0 <br />(5,000) <br />TOTAL SOURCES <br />01 <br />01 <br />6,160 <br />1 2,302 <br />1 21,041 <br />1 01 <br />01 <br />01 <br />01 <br />29,493 <br />Site location to be determined. <br />2017 - 2022 Capital Improvement Program 61 <br />W <br />