City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
TIC 2017-04-25 COMPLETE AGENDA PACKET
COT-City
>
City Clerk
>
Council Committees
>
Transportation and Infrastructure (2017-2020)
>
Transportation and Infrastructure Agenda Packets (2017-Present)
>
2017-04-25 Transportation and Infrastructure
>
TIC 2017-04-25 COMPLETE AGENDA PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2021 12:29:47 PM
Creation date
4/20/2017 2:48:43 PM
Metadata
Fields
Template:
Council Committees
Committees Date (mm/dd/yy)
04/25/17
Committee Name
Transportation and Infrastructure 2017-2020
Record Type
Agenda Packet
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF TUKWILA CAPITAL PROJECT SUMMARY <br /> 2017 to 2022 <br /> PROJECT: Gilliam Creek 42 Ave S Surface Water Culvert Project No. 99410303 <br /> 99341208 <br /> DESCRIPTION: Design and replace the 36-inch surface water culvert under 42 Ave S/Gilliam Creek. Combining this project <br /> with the Residential Street Project 42nd Ave S Phase III. <br /> JUSTIFICATION: The existing concrete pipe sections are separating and cracked which could erode the 42 Ave S fill and <br /> lead to loss of roadway. <br /> STATUS: Project is currently under design with construction scheduled to begin in 2017. <br /> MAINT.IMPACT: Expected to decrease maintenance. <br /> COMMENT: State Fish&Wildlife hydraulic project approved(HPA)permit will be required. Replacement will require <br /> a fish passable structure. <br /> FINANCIAL Through Estimated <br /> (in$000's) 2015 2016 2017 2018 2019 2020 2021 2022 BEYOND TOTAL <br /> EXPENSES <br /> Design 144 31 175 <br /> Land(R/W) 0 <br /> Const. Mgmt. 135 15 150 <br /> Construction 8 900 100 1,008 <br /> TOTAL EXPENSES 152 311 1,035 1 115 1 01 01 01 01 01 1,333 <br /> FUND SOURCES <br /> Awarded Grant 0 <br /> Proposed Grant 0 <br /> Mitigation Actual 0 <br /> Mitigation Expected 0 <br /> Utility Revenue 152 31 1,035 115 0 0 0 0 0 1,333 <br /> TOTAL SOURCES 152 31 1,035 115 0 1 0 0 1 0 0 1 1,333 <br /> Project I-ocation <br /> �;. A <br /> stsoi- �5 �:r1 " c S <br /> A 4 <br /> ifs <br /> f <br /> ry T <br /> $§ 141 <br /> { / ; t, <br /> ` <br /> ~ j.0 _L S 45f7 Stj 1, _ <br /> Ito at <br /> E q <br /> 1a8�9t /,yams f .x^•hy X41.. <br /> 2017-2022 Capital Improvement Program 100 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.