Laserfiche WebLink
Certified Bid Tab <br />40 -42nd Avenue S Phase!!! Project <br />Engineer's Estimate <br />Gary Merlino Construction <br />Kiewit Infrastructure West Co. <br />Active Construction <br />Bid Item. <br />No. <br />Item D scri ption <br />u <br />Uni <br />Unit Pric <br />Total Pri <br />Unit Pri <br />Totai Pilsej <br />Unit Pric <br />Total Pri <br />Unit Fri <br />i <br />Total Pri <br />B5 <br />Gravel Borrow Incl. Haul <br />3700 <br />CY <br />20.00 <br />$ 74,000.00 <br />61.00 $ <br />225,700.00 <br />44.00 $ <br />162,800.00 <br />$ <br />74,000.00 <br />B6 <br />Temporary Structural Shoring for Culvert Footing <br />LS <br />$ 96,000.00 <br />$ 96,000.00 <br />$ 60,000.00 $ <br />60,000.00 <br />$ 50,000.00 $ 50,000.00 <br />$ 50,000.00 $ 50,000.00 <br />B7 <br />Conc. Class 4000 for Culvert Footing <br />170 <br />CY <br />$ 600.00 <br />$ 102,000.00 <br />$ 400.00 $ <br />68,000.00 <br />1.00 $ 170.00 <br />$ 500.00 $ <br />85,000.00 <br />B8 <br />St Reinf. Bar for Culvert Footing <br />24000 <br />LBS <br />$ 1.50 <br />$ 36,000.00 <br />1.50 $ 36,000.00 <br />0.01 $ 240.00 <br />2.00 $ 48,000.00 <br />B9 <br />St Str. Plate Arch 10 Gage 16 ft. Span <br />146 <br />LF <br />$ 515.00 <br />$ 75,190.00 <br />$ 1,060.00 $ <br />154,760.00 <br />$ 1,900.00 $ <br />277,400.00 <br />$ 1,350.00 $ <br />197,100.00 <br />B10 <br />Steambed Boulders - One Man <br />88 <br />TON <br />$ 45.00 <br />$ 3,960.00 <br />$ 120.00 $ <br />10,560.00 <br />$ 140.00 $ <br />12,320.00 <br />$ 115.00 $ <br />10,120.00 <br />B11 <br />Steambed Boulders - Two Man <br />88 <br />TON <br />$ 90.00 <br />$ 7,920.00 <br />$ 120.00 $ <br />10,560.00 <br />$ 140.00 $ <br />12,320.00 <br />$ 103.00 $ <br />9,064.00 <br />B12 <br />Steambed Cobbles <br />675 <br />TON <br />$ 45.00 <br />$ 30,375.00 <br />85.00 $ 57,375.00 <br />38.00 $ 25,650.00 <br />52.00 $ 35,100.00 <br />B13 <br />Coarse Band <br />3 <br />EA <br />$ 2,000.00 <br />$ 6,000.00 <br />$ 2,500.00 $ <br />7,500.00 <br />$ 1,600.00 $ <br />4,800.00 <br />$ 1,750.00 $ <br />5,250.00 <br />B14 <br />Temporary Stream Diversion <br />LS <br />$ 55,000.00 <br />$ 55,000.00 <br />$ 105,000.00 $ <br />105,000.00 <br />$ 90,000.00 $ 90,000.00 <br />$ 40,000.00 $ 40,000.00 <br />B15 <br />High Visibiliy Fence <br />250 <br />LF <br />$ 4.00 <br />$ 1,000.00 <br />4.00 $ 1,000.00 <br />5.25 $ 1,312.50 <br />3.00 $ 750.00 <br />B16 <br />Topsoil Type A (4" Depth) <br />0.20 <br />ACRE <br />$ 30,000.00 <br />$ 6,000.00 <br />$ 23,000.00 $ <br />4,600.00 <br />$ 18,000.00 $ <br />3,600.00 <br />$ 30,000.00 $ 6,000.00 <br />B17 <br />Seed, Fertilize & Mulching (Native Seed Mix A) <br />0.20 <br />ACRE <br />$ 10,000.00 <br />$ 2,000.00 <br />$ 3,800.00 $ <br />760.00 <br />$ 4,000.00 $ <br />800.00 <br />$ 5,000.00 $ <br />1,000.00 <br />B18 <br />Fine Compost (3" depth) <br />0.20 <br />ACRE <br />$ 15,500.00 <br />$ 3,100.00 <br />$ 18,000.00 $ <br />3,600.00 <br />$ 18,000.00 $ <br />3,600.00 <br />$ 35,000.00 $ 7,000.00 <br />B19 <br />PSIPE, SALIX LASIANDRA ( #3) <br />4 <br />EA <br />$ 45.00 <br />180.00 <br />33.00 $ 132.00 <br />25.00 $ 100.00 <br />21.00 $ 84.00 <br />B20 <br />PSIPE, SALIX SCOULERIANA ( #3) <br />4 <br />EA <br />$ 45.00 <br />180.00 <br />33.00 $ 132.00 <br />25.00 $ 100.00 <br />30.00 $ 120.00 <br />B21 <br />PSIPE, BETULA PAPYRIFERA ( #3) <br />4 <br />EA <br />$ 45.00 <br />180.00 <br />33.00 $ 132.00 <br />31.00 $ 124.00 <br />30.00 $ 120.00 <br />B22 <br />PSIPE, FRAXINUS LATIFOLIA ( #3) <br />4 <br />EA <br />$ 45.00 <br />180.00 <br />33.00 $ 132.00 <br />25.00 $ 100.00 <br />30.00 $ 120.00 <br />B23 <br />PSIPE, THUJA PLICATA ( #3) <br />4 <br />EA <br />$ 45.00 <br />180.00 <br />33.00 $ 132.00 <br />31.00 $ 124.00 <br />30.00 $ 120.00 <br />B24 <br />PSIPE, TSUGA HETEROPHYLLA ( #3) <br />4 <br />EA <br />$ 45.00 <br />180.00 <br />33.00 $ 132.00 <br />38.00 $ 152.00 <br />30.00 $ 120.00 <br />B25 <br />PSIPE, ALNUS RUBRA ( #3) <br />4 <br />EA <br />$ 45.00 <br />180.00 <br />33.00 $ 132.00 <br />29.00 $ 116.00 <br />30.00 $ 120.00 <br />B26 <br />PSIPE, ACER CIRCINATUM ( #3) <br />4 <br />EA <br />$ 45.00 <br />180.00 <br />33.00 $ 132.00 <br />25.00 $ 100.00 <br />30.00 $ 120.00 <br />B27 <br />PSIPE, ACER MACROPHYLLUM ( #3) <br />4 <br />EA <br />$ 45.00 <br />180.00 <br />33.00 $ 132.00 <br />25.00 $ 100.00 <br />30.00 $ 120.00 <br />B28 <br />PSIPE, PSEUDOTSUGA MENZIESII ( #3) <br />4 <br />EA <br />$ 45.00 <br />180.00 <br />33.00 $ 132.00 <br />29.00 $ 116.00 <br />30.00 $ 120.00 <br />B29 <br />PSIPE, PINUS CONTORTA ( #3) <br />4 <br />EA <br />$ 45.00 <br />180.00 <br />33.00 $ 132.00 <br />38.00 $ 152.00 <br />30.00 $ 120.00 <br />B30 <br />PSIPE, CORNUS SERICEA ( #3) <br />21 <br />EA <br />$ 45.00 <br />945.00 <br />33.00 $ 693.00 <br />25.00 $ 525.00 <br />30.00 $ 630.00 <br />B31 <br />PSIPE, SAMBUCUS RACEMOSA ( #3) <br />21 <br />EA <br />$ 45.00 <br />945.00 <br />33.00 $ 693.00 <br />28.00 $ 588.00 <br />30.00 $ 630.00 <br />B32 <br />PSIPE, MYRICA CALIFORNICA ( #3) <br />21 <br />EA <br />$ 45.00 <br />945.00 <br />33.00 $ 693.00 <br />42.00 $ 882.00 <br />30.00 $ 630.00 <br />B33 <br />PSIPE, RIBES SANGUINEUM ( #3) <br />23 <br />EA <br />$ 45.00 <br />$ 1,035.00 <br />33.00 $ 759.00 <br />25.00 $ 575.00 <br />30.00 $ 690.00 <br />B34 <br />PSIPE, HOLODISCUS DISCOLOR ( #3) <br />24 <br />EA <br />$ 45.00 <br />$ 1,080.00 <br />33.00 $ 792.00 <br />29.00 $ 696.00 <br />30.00 $ 720.00 <br />B35 <br />PSIPE, SYMPHORICARPOS ALBUS ( #3) <br />21 <br />EA <br />$ 45.00 <br />945.00 <br />33.00 $ 693.00 <br />29.00 $ 609.00 <br />30.00 $ 630.00 <br />B36 <br />Temporary Irrigation System <br />LS <br />$ 35,000.00 <br />$ 35,000.00 <br />$ 16,000.00 $ <br />16,000.00 <br />$ 6,950.00 $ <br />6,950.00 <br />$ 16,500.00 $ 16,500.00 <br />B37 <br />Settlement Monitoring <br />LS <br />$ 16,000.00 <br />$ 16,000.00 <br />$ 30,000.00 $ <br />30,000.00 <br />$ 15,000.00 $ 15,000.00 <br />$ 10,000.00 $ 10,000.00 <br />B38 <br />Remove and Reset Streambank Boulders <br />LS <br />$ 5,000.00 <br />$ 5,000.00 <br />$ 15,000.00 $ <br />15,000.00 <br />$ 13,000.00 $ 13,000.00 <br />$ 3,000.00 $ 3,000.00 <br />B39 <br />Fish Exclusion <br />FA <br />$ 1,000.00 <br />$ 1,000.00 <br />$ 1,000.00 $ <br />1,000.00 <br />$ 1,000.00 $ <br />1,000.00 <br />$ 1,000.00 $ 1,000.00 <br />Subtotal Schedule B <br />$ 729,650.00 <br />$ 972,670.00 <br />$ 988,471.50 <br />$ 787,508.00 <br />Schedule C -- Power and Communications Undergrounding <br />C1 <br />Unexpected Site Changes <br />1 <br />FA <br />$ 15,000.00 <br />$ 15,000.00 <br />$ 15,000.00 <br />$ 15,000.00 <br />$ 15,000.00 <br />$ 15,000.00 <br />$ 15,000.00 <br />$ 15,000.00 <br />C2 <br />Franchise Utility Coordination <br />1 <br />FA <br />$ 10,000.00 <br />$ 10,000.00 <br />$ 10,000.00 <br />$ 10,000.00 <br />$ 10,000.00 <br />$ 10,000.00 <br />$ 10,000.00 <br />$ 10,000.00 <br />C3 <br />Utility Potholing <br />1 <br />FA <br />$ 15,000.00 <br />$ 15,000.00 <br />$ 15,000.00 <br />$ 15,000.00 <br />$ 15,000.00 <br />$ 15,000.00 <br />$ 15,000.00 <br />$ 15,000.00 <br />Joint Communications Ductbank <br />C4 <br />Structure Excavation Class B Incl. Haul for Joint Trench <br />2200 <br />CY <br />35.00 <br />$ 77,000.00 <br />90.00 $ 198,000.00 <br />55.00 $ 121,000.00 <br />65.50 $ 144,100.00 <br />C5 <br />Shoring or Extra Excavation Class B for Joint Trench <br />24000 <br />SF <br />2.00 <br />$ 48,000.00 <br />1.00 $ 24,000.00 <br />1.00 $ 24,000.00 <br />0.30 $ 7,200.00 <br />C6 <br />Joint Trench Pipe Zone Bedding, Including Haul <br />400 <br />CY <br />$ 35.00 <br />$ 14,000.00 <br />40.00 $ 16,000.00 <br />65.00 $ 26,000.00 <br />38.30 $ 15,320.00 <br />a City of Tukwila <br />42nd Ave S - Phase III <br />Bid Tab <br />4/11/2017 <br />