City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
TIC 2017-05-09 COMPLETE AGENDA PACKET
COT-City
>
City Clerk
>
Council Committees
>
Transportation and Infrastructure (2017-2020)
>
Transportation and Infrastructure Agenda Packets (2017-Present)
>
2017-05-09 Transportation and Infrastructure
>
TIC 2017-05-09 COMPLETE AGENDA PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2021 12:29:48 PM
Creation date
5/4/2017 1:45:37 PM
Metadata
Fields
Template:
Council Committees
Committees Date (mm/dd/yy)
05/09/17
Committee Name
Transportation and Infrastructure 2017-2020
Record Type
Agenda Packet
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
���t of Tukwila <br />Public Works Department -8ob Giberson, Director <br />Transportation and Infrastructure Co 'ttee <br />Bob Gibersom, Public Works Director <br />Mike Cusick, Senior Program Manager <br />Mayor Ekberg <br />May 5, 2017 <br />Altan Ekberg, Mayor <br />SUBJECT: CBD Sanitary Sewer Rehabilitation - 2016 Andover Park East Sewer Rel2ai <br />Project No. 91140203 <br />Bid Award <br />ISSUE <br />Award contract to Gary Harper Construction, Inc. for the Commercial Business 0nthot (CB[) Sanitary <br />Sewer Rehabilitation - 2016 Andover Park East Sewer Repair Project. <br />|D2018, the Council approved th8CBD Sanitary Sewer Rehabilitation Project to address the <br />deterioration of the asbestos sewer pipe in the CBU. The 2O10Andover Park East Sewer Repair <br />Project will address the sewer pipe in Andover Park East, south of Costco Dr., that could not be relined <br />due iOdeterioration of the pipe. <br />ANALYSIS <br />The 2016 Andover Park East Sewer Repair Project was advertised forbid on�h|8��1O'�17�d <br />four bids were [eC8�edVOAoh|20.2U17.AU bids were reviewed and t8bU|8��d�and two errors were <br />diSC0VeR3d in the hid submittals that did not affect the bid [8DhiDg. Gary Harper Construction, Inc. <br />submitted the apparent low bid 0f$413'985.5O for the 2O18 Andover Park East Sewer Repair P HCt. <br />(�8rVHarper (�OOSi[UCtiOD.Inc. has previously pCdbrDBdVvOd<for the (�itVthat VV@Sfound iOb8 - <br />G8USf8C10[y. The Engineer's Estimate for the project was $413,770.50. <br />Bid Amount Estimate <br />Gary Harper Construction, Inc. $410,935-50 $413,77O.50 <br />Contingency 20% 82,787.10 0.00 <br />RECOMMENDATION <br />Budget <br />Council is being asked to award the construction of the CBD Sanitary Sewer Rehabilitation - 2016 <br />Andover Park East Sewer Repair Project tOG8[yH8[p8[COOSLRJCtiOO.|Dc.iOthe amount of <br />$413.935.5O and consider this item OD the Consent Agenda 8t the May 15.2O17 Regular Meeting. <br />Attachments: Page 81, 2017 QP <br />Bid Tabulation <br />WAP*sng\Pnosors\A-mwproj°*s\000 Sewer Rehabilitation (9,,^02o3)\/"m Memo u,m APE Sewer Repair Bid Award v50n,rgl sm`do= <br />
The URL can be used to link to this page
Your browser does not support the video tag.