Laserfiche WebLink
Exhibit A <br />ARV <br />13710 "6 <br />• <br />_5 <br />TP <br />5. 11010 3 <br />140th ST <br />142nd ST <br />42nd 3T <br />21,0' ST <br />4 +2nd 71. <br />1111h -501 - <br />46TH AVE s <br />SHEET W9 (SET 2) <br />0 1461 <br />1. 14111h ?r <br />171.11 ST <br />1481(1 3T <br />11 ;111 50 <br />1811,. .7T__ - -_s <br />_`148th ST <br />71 00. 1 -40th 5T'. <br />150th 5T. <br />Id ST <br />- <br />S. I52nd PT. <br />5 15410 ST <br />1 <br />PROJECT <br />LOCATION <br />4- Issue PT <br />SR 405 <br />HI ST <br />h ST <br />T <br />10011, 05 . <br />ZONE 2 SOURCE <br />SEATTLE WATER <br />HGL = 15341 <br />ZONE 2 SOURCE <br />SEATTLE WATER <br />HGL = 12 525 <br />GRAPHIC SCALE <br />500 0 250 500 <br />1000 <br />MI MI MI <br />( IN FEET <br />1 Inch = 500feet <br />KING COUNTY <br />WATER DISTRICT NO. 125 <br />42ND AVE PHASE 111 PROJECT <br />SCHEDULE E <br />BOARD OF COMMISSIONERS: <br />RENEA BLANCHETTE, COMMISSIONER <br />JERRY THORNTON, COMMISSIONER <br />JOHN THOMPSON, COMMISSIONER <br />SHANE YOUNG, GENERAL MANAGER <br />INDEX <br />SHEET NO SHEET TITLE <br />WD 125 WATER IMPROVEMENTS <br />COVER SHEET <br />WATER PLAN <br />WATER PLAN <br />WATER PLAN <br />SPU METER SITE PLAN <br />SPU METER DETAIL <br />7 NOTES & DETAILS <br />DESIGNED DH <br />DRAWN MM <br />CHECKED DH <br />SYM <br />REVISION <br />DATE <br />BY <br />APP'D <br />11255 Kirkland Way, Suite 300 <br />/ / /�/ //•►�' �\ Kirkland, WA 98033 <br />ACE p. 425.827.2014 If 425.827.5043 <br />`\�Civ31 Structural 1 Planning 'Survey <br />An Engineering Services Company paceengrS.com <br />King County <br />Water District <br />No. 125 <br />DATE <br />FEBRUARY 2017 <br />SCALE <br />AS NOTED <br />42ND AVE PHASE 111 <br />COVER SHEET <br />JOB NUMBER <br />13073.00 <br />DWG NAME: P13073_CVR <br />SHEET 1 OF 7 <br />Page 1 of 8 <br />