City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
TIC 2017-05-23 Item 2E - Resolution - 2018-2023 Transportation Improvement Program
COT-City
>
City Clerk
>
City Council Committees Meetings
>
Previous Committees
>
Transportation and Infrastructure (2017-2020)
>
Transportation and Infrastructure Agenda Packets (2017-2020)
>
2017 Transportation and Infrastructure Packets
>
2017-05-23 Transportation and Infrastructure
>
TIC 2017-05-23 Item 2E - Resolution - 2018-2023 Transportation Improvement Program
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2021 12:29:49 PM
Creation date
5/19/2017 9:48:06 AM
Metadata
Fields
Template:
Council Committees
Committees Date (mm/dd/yy)
05/23/17
Committee Name
Transportation and Infrastructure 2017-2020
Record Type
Agenda Packet
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Agency: Tukwila <br />County: King <br />MPO/RTPO: PSRC <br />Y Inside <br />Six Year Transportation Improvement Program <br />From 2018 to 2023 <br />N Outside <br />Jag w n ry Alpopd <br />A. PIN/Project No. <br />C. Project Title <br />D. Road Name or Number <br />E. Begin & End Termini <br />F. Project Description <br />B. STIP ID <br />G. Structure ID <br />x <br />CD <br />0 <br />luawpuawv <br />.ory uonniosaN <br />adAi luawanaidwi <br />sapoo Alunn <br />416uai ieloi <br />adAi ieluawucuvaig <br />pai!nbaN AAN <br />00 <br />/1320(005) <br />Cascade View Elementary Safe Routes to School Project - Phase 2 <br />33rd Ave S and S 140th Street <br />S. 144th at 34th Ave. S. to 140th St at 34th Ave. S. <br />Concrete sidewalks are proposed on one side of 33rd Ave S (S 140th St to S 144th <br />St) and on one side of S. 140th St (Military Road South to 34th Ave S) along with a <br />standard curb and gutter separating the sidewalk from the roadway. A traffic circle is <br />proposed at the intersection of 33rd Ave S and S 140th St to assist in reducing <br />vehicle speeds and increase visibility and safety of pedestrians crossing the street. <br />Curb bulb-outs and/or pedestrian refuge islands at the east entrance/exit to the traffic <br />circle would be constructed to improve the safety of crossing S 140th St at 33rd Ave <br />S. There are currently no ADA facilities to connect to within the project limits. Minor <br />storm water improvements will be added to the general action area. The new <br />sidewalk along 33rd Ave S. will require reconstruction of the pavement cross section <br />to establish proper crown slopes. <br />TUK-58 <br />06/12/17 <br />06/19/17 <br />28 <br />0.510 <br />CE <br />No <br />Funding <br />Status <br />Phase <br />Phase Start Year (YYYY) <br />Federal Fund Code <br />Federal Funds <br />State Fund Code <br />State Funds <br />Local Funds <br />Total Funds <br />S <br />CN <br />2018 <br />SRTS <br />714,000 <br />0 <br />100,000 <br />814,000 <br />Totals <br />714,000 <br />0 <br />100,000 <br />814,000 <br />Expenditure Schedule <br />Phase <br />ALL <br />Totals <br />1st <br />814,000 <br />814,000 <br />2nd <br />0 <br />0 <br />3rd <br />0 <br />0 <br />4th <br />0 <br />0 <br />5th & 6th <br />0 <br />0 <br />Report Date: May 17, 2017 <br />Page 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.