Laserfiche WebLink
Building Design <br />The additions expand the academic wing to the north and east, and the activity wing to the east <br />and north. The existing street - facing brick fapades of the wings will remain unchanged; the <br />additions are connected but designed in a contrasting building style, with generally different <br />materials. <br />The academic wing addition is recessed from the street - facing brick fapade by 20 feet. Precast <br />concrete will form an ivory - colored base, matching the ivory base of the brick wing adjacent. <br />The windows also take their form from the existing brick building. The brick fapade has windows <br />that are rectangular in shape, divided horizontally above the midpoint and grouped in sets of <br />four. The proposed addition has windows of similar design, but grouped in sets of six. <br />There is modulation in the STEAM addition's north fapade as learning studios project and <br />recess alternately. While the classrooms are modulated building elements, the roofline is not <br />modulated. The roof projects in a flat line, forming sheltered recessed space where learning <br />studios are set back and flush to the building wall where learning studios jut northward. <br />The academic wing addition is finished with metal panels and cement fiber panels in dark grey <br />and rust colors. Dark grey fiber cement panels applied with vertical seams forms the bulk of the <br />building's exterior, with rust - colored fiber cement panels applied on the exterior of the recessed <br />learning studios. Light - colored metal panels visually divide the first and second stories. <br />The activities wing expansion takes much of its form and materials from the academic wing <br />building expansion design. The roofline is flat, and aligns with the bottom of the gable of the <br />existing brick building's peaked roofline. The auxillary gym is finished with fiber cement panels <br />of dark grey, dark blue, and rust. Windows on the southern fapade divide the dark grey fiber <br />board panels with vertical seams from the dark blue panels in a different panel shape, and are <br />roughly aligned with the second -story windows of the brick building. On the east side of the <br />gym, the dark grey panels cover the top 2 /3rds of the fapade, with rust panels on the bottom. <br />Long, rectangular windows inset in thin vertical panels of light- colored metal. These panels are <br />aligned at different intervals in the dark grey part of the building than in the rust paneled lower <br />portion of the fapade. <br />Enclosing the open courtyard, building additions at the entry to the school are largely glass <br />windows on the first story, with accents of grey metal panels forming the connection to the ends <br />of the academic and activity wings. On the second story, a sunshade will be applied to the <br />existing skybridge. Metal paneling will frame the second story above the skybridge. The <br />easternmost fapade of the academic building, and the expansions along the activities wing and <br />behind the S. 144th Street fapade mix and match elements from the STEAM addition, auxillary <br />gym, and courtyard entry described above. <br />11 <br />13 <br />