City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
Planning 2017-06-22 Item 4 - Foster High School Expansion and Birth to Kindergarten - Attachment D: SEPA Mitigated Determination of Nonsignificance by Tukwila School District (5/9/2017)
COT-City
>
City Clerk
>
Boards and Commissions
>
Planning Commission
>
Planning Commission Agenda Packets
>
2011-2019 Agenda Packets
>
2017-06-22 Planning Commission / Board of Architectural Review - Foster High School Expansion and Birth to Kindergarten
>
Planning 2017-06-22 Item 4 - Foster High School Expansion and Birth to Kindergarten - Attachment D: SEPA Mitigated Determination of Nonsignificance by Tukwila School District (5/9/2017)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2017 1:16:07 PM
Creation date
6/16/2017 1:16:06 PM
Metadata
Fields
Template:
Boards and Commissions
Date (mm/dd/yy)
06/22/17
Board or Commission Name
Planning Commission
Agenda or Minutes
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Transportation <br />24. The Schools and District will coordinate the scheduling of special events so that they do not <br />overlap. <br />25. Bell schedules for the Birth to Kindergarten Center and Showalter Middle School will be <br />staggered to ensure emergency vehicle access is not compromised by simultaneous queuing. <br />26. A haul route control plan will be prepared and approved by the City of Tukwila prior to the start of <br />construction. <br />27. To ensure parking is adequate at Foster High School, a zoning variance shall be secure to allow <br />for a reduction to 174 spaces onsite, pursuant to a Type III procedure. <br />28. A Transportation Impact Fee applies to the future Birth -to- Kindergarten Center Building permit. <br />(PW Bulletin A3). Transportation Impact Fee will be based on 440 students in Zone 3 at $119.31 <br />per student = $52,496.40. The final amount to be confirmed by the City Engineer at a future date. <br />This Mitigated Determination of Non - significance (MDNS) is issued under the Washington Administrative <br />Code (WAC) 197 -11- 340(2); the lead agency will not act on this proposal for 14 days from the date of <br />issuance. Only written comments will be accepted and must be submitted by 5:00 pm on May 23, 2017 <br />to the District contact. There is no agency appeal of this MDNS. Appeals are governed by RCW <br />43.21C.075. <br />SEPA Responsible Official Signature: <br />Issue Date: May 9, 2017 <br />Last Day to Comment: May 23, 2017 <br />110 <br />Dr. Judith Berry, D uty Srintendent <br />Tukwila School trict <br />4640 South 144th Street <br />Tukwila, WA 98168 <br />berryiC@tukwila.wednet.edu <br />'17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.