City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
2017-03-15 Bid Results - Boeing Access Road Bridge Rehabilitation
COT-City
>
City Clerk
>
CITY DEPARTMENTS
>
Public Works Department
>
Bids and Tabulations
>
2017-03-15 - Boeing Access Road Bridge Rehabilitation
>
2017-03-15 Bid Results - Boeing Access Road Bridge Rehabilitation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2017 4:03:20 PM
Creation date
6/20/2017 1:17:23 PM
Metadata
Fields
Template:
City Departments
Department Name
Public Works Department
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF <br />F a v t, <br />Christy O'Flaherty, MMC, City Cleric <br />OPENING <br />F�-oeing Access Road Bridge Rehabilitation <br />Project 99410408 <br />March 15, • • 00 A.M. <br />The above figures appear as written within bid documents; and as read aloud at bid <br />opening. THEY DO NOT however, REPRESENT ANY BID AWARD; apparent low, or <br />otherwise. <br />DATED this 15th day March 2017. <br />P <br />Christy O'Flahe ,City Clerk <br />ADDENDUMS <br />APPARENT <br />BIDDER NAME & <br />SECURITY <br />ACKNOWLEDGED <br />TOTAL BID PRICE <br />LOWEST BIDDER <br />DATE STAMP OF RECEIPT <br />BID REC'D.? <br />2 <br />Includin Tax <br />RANK ORDER <br />Ceccanti <br />3/15/17 9:13 AM <br />Y <br />Y <br />$10,456,302.00 <br />5 <br />SB Structures, LLC <br />3/15/17 9:18 AM <br />Y <br />Y <br />$6,986,068.95 <br />3 <br />Flatiron West, Inc. <br />3/15/17 9:21 AM <br />Y <br />Y <br />$9,291,018.00 <br />4 <br />PCL Construction <br />3/15/17 9:26 AM <br />Y <br />Y <br />$6,189,244.00 <br />1 <br />Stellar 3 <br />3/15/17 9:27 AM <br />Y <br />Y <br />$6,758,668.00 <br />2 <br />ENGINEER'S ESTIMATE <br />$7,131,009.00 <br />The above figures appear as written within bid documents; and as read aloud at bid <br />opening. THEY DO NOT however, REPRESENT ANY BID AWARD; apparent low, or <br />otherwise. <br />DATED this 15th day March 2017. <br />P <br />Christy O'Flahe ,City Clerk <br />
The URL can be used to link to this page
Your browser does not support the video tag.