Laserfiche WebLink
Certified Bid Tab <br />40 -42nd Avenue S Phase 111 Project <br />Engineer's Estimate <br />Gary Merlino Construction <br />Kiewit Infrastructure West Co. <br />Active Construction <br />Bid ;It" <br />em <br />No <br />_.., Item" Descri ti = . , <br />p <br />, <br />uant�t <br />Q <br />y <br />, U n t <br />U �t..r <br />... n P ice <br />°:;, ° . <br />Total_Pr�ce <br />..::Unit ." <br />Price <br />..;;....Total P.nce" <br />Umt Pace � <br />Total Pace . <br />::Unit Pace <br />Total Price.. <br />Schedule A - Roadway <br />Al <br />Mobilization <br />IMMIIIIII® $ 366,500.00 <br />$ 366,500.00 <br />$ 752,000.00 <br />$ 752,000.00 <br />$ 706,000.00 <br />$ 706,000.00 <br />$ 618,423.04 <br />$ 618,423.04 <br />A2 <br />Resolution of Utility Conflicts <br />1111111111 FA $ 20,000.00 <br />$ 20,000.00 <br />$ 20,000.00 <br />$ 20,000.00 <br />$ 20,000.00 <br />$ 20,000.00 <br />$ 20,000.00 <br />$ 20,000.00 <br />A3 <br />Field Office Building <br />$ 20,000.00 <br />$ 20,000.00 <br />$ 12,000.00 <br />$ 12,000.00 <br />$ 75,000.00 <br />$ 75,000.00 <br />$ 25,000.00 <br />$ 25,000.00 <br />A4 <br />Type B Progress Schedule, min. Bid $5,000.00 <br />� $ 5,000.00 <br />1111111111111111.2.1 ® <br />$ 5,000.00 <br />$ 5,000.00 <br />$ 5,000.00 <br />$ 5,000.00 <br />$ 5,000.00 <br />$ 10,000.00 <br />$ 10,000.00 <br />A5 <br />Unexpected Site Changes <br />MEM FA $ 15,000.00 <br />$ 15,000.00 <br />$ 15,000.00 <br />$ 15,000.00 <br />$ 15,000.00 <br />$ 15,000.00 <br />$ 15,000.00 <br />$ 15,000.00 <br />A6 <br />Record Drawings, min. Bid $5,000.00 <br />1 LS <br />$ 5,000.00 <br />$ 5,000.00 <br />$ 5,000.00 <br />$ 5,000.00 <br />$ 5,000.00 <br />$ 5,000.00 <br />$ 5,000.00 <br />$ 5,000.00 <br />A7 <br />Roadway Surveying <br />NIIUII® <br />$ 15,000.00 <br />$ 15,000.00 <br />$ 60,000.00 <br />$ 60,000.00 <br />$ 50,000.00 <br />$ 50,000.00 <br />$ 55,000.00 <br />$ 55,000.00 <br />A8 <br />Utility Potholing <br />1 FA <br />$ 15,000.00 <br />$ 15,000.00 <br />$ 15,000.00 <br />$ 15,000.00 <br />$ 15,000.00 <br />$ 15,000.00 <br />$ 15,000.00 <br />$ 15,000.00 <br />A9 <br />Flaggers and Spotters, min. Bid $50.00 per hour <br />2200 <br />MEM <br />$ 50.00 <br />$ 110,000.00 <br />$ 60.00 <br />$ 132,000.00 <br />$ 70.00 <br />$ 154,000.00 <br />$ 66.00 <br />$ 145,200.00 <br />A10 <br />Other Traffic Control Labor, min. Bid $50.00 per hour <br />500 <br />HR <br />$ 50.00 <br />$ 25,000.00 <br />$ 60.00 <br />$ 30,000.00 <br />$ 70.00 <br />$ 35,000.00 <br />$ 66.00 <br />$ 33,000.00 <br />All <br />Traffic Control Supervisor, min. Bid $50.00 per hour <br />320 <br />HR <br />$ 60.00 <br />$ 19,200.00 <br />$ 72.00 <br />$ 23,040.00 <br />$ 80.00 <br />$ 25,600.00 <br />$ 66.00 <br />$ 21,120.00 <br />Al2 <br />Construction Signs Class A <br />250 <br />® <br />$ 20.00 <br />$ 5,000.00 <br />$ 25.00 <br />$ 6,250.00 <br />$ 15.00 <br />$ 3,750.00 <br />$ 27.00 <br />$ 6,750.00 <br />A13 <br />Sequential Arrow Sign <br />750 <br />MI= <br />$ 3.00 <br />$ 2,250.00 <br />$ 2.00 <br />$ 1,500.00 <br />$ 4.50 <br />$ 3,375.00 <br />$ 2.00 <br />$ 1,500.00 <br />A14 <br />Portable Changeable Message Sign <br />970 <br />HR <br />$ 3.50 <br />$ 3,395.00 <br />$ 3.00 <br />$ 2,910.00 <br />$ 17.00 <br />$ 16,490.00 <br />$ 4.00 <br />$ 3,880.00 <br />A15 <br />Outside Agency Uniformed Police Flagging Labor <br />=MI <br />FA <br />$ 3,000.00 <br />$ 3,000.00 <br />$ 3,000.00 <br />$ 3,000.00 <br />$ 3,000.00 <br />$ 3,000.00 <br />$ 3,000.00 <br />$ 3,000.00 <br />A16 <br />Clearing and Grubbing <br />2.0 <br />AC <br />$ 15,000.00 <br />$ 30,000.00 <br />$ 30,000.00 <br />$ 60,000.00 <br />$ 9,000.00 <br />$ 18,000.00 <br />$ 45,000.00 <br />$ 90,000.00 <br />A17 <br />Roadside Cleanup <br />MEI <br />FA <br />$ 5,000.00 <br />$ 5,000.00 <br />$ 5,000.00 <br />$ 5,000.00 <br />$ 5,000.00 <br />$ 5,000.00 <br />$ 5,000.00 <br />$ 5,000.00 <br />A18 <br />Remove Existing Drainage Structure <br />18 <br />EA <br />$ 350.00 <br />$ 6,300.00 <br />$ 350.00 <br />$ 6,300.00 <br />$ 500.00 <br />$ 9,000.00 <br />$ 200.00 <br />$ 3,600.00 <br />A19 <br />Remove Existing Storm Sewer Pipe <br />1800 <br />® <br />$ 5.00 <br />$ 9,000.00 <br />$ 20.00 <br />$ 36,000.00 <br />$ 13.00 <br />$ 23,400.00 <br />$ 21.00 <br />$ 37,800.00 <br />A20 <br />Removal of Structure and Obstructions <br />1 <br />LS <br />$ 25,000.00 <br />$ 25,000.00 <br />$ 7,000.00 <br />$ 7,000.00 <br />$ 25,000.00 <br />$ 25,000.00 <br />$ 75,000.00 <br />$ 75,000.00 <br />A21 <br />Removal and Relocation of Existing Private Improvements <br />© <br />FA <br />$ 8,000.00 <br />$ 8,000.00 <br />$ 8,000.00 <br />$ 8,000.00 <br />$ 8,000.00 <br />$ 8,000.00 <br />$ 8,000.00 <br />$ 8,000.00 <br />A22 <br />Pavement Sawcutting <br />3810 <br />® <br />$ 2.50 <br />$ 9,525.00 <br />$ 4.00 <br />$ 15,240.00 <br />$ 3.25 <br />$ 12,382.50 <br />$ 3.00 <br />$ 11,430.00 <br />A23 <br />Remove Hydrant <br />© <br />EA <br />$ 1,000.00 <br />$ 2,000.00 <br />$ 2,000.00 <br />$ 4,000.00 <br />$ 1,500.00 <br />$ 3,000.00 <br />$ 5,500.00 <br />$ 11,000.00 <br />A24 <br />Roadway Excavation Incl. Haul <br />2600 <br />® <br />$ 35.00 <br />$ 91,000.00 <br />$ 80.00 <br />$ 208,000.00 <br />$ 46.00 <br />$ 119,600.00 <br />$ 42.00 <br />$ 109,200.00 <br />A25 <br />Gravel Borrow Incl. Haul <br />5050 <br />MIN <br />$ 20.00 <br />$ 101,000.00 <br />$ 57.00 <br />$ 287,850.00 <br />$ 38.00 <br />$ 191,900.00 <br />$ 5.00 <br />$ 25,250.00 <br />A26 <br />Gravel Backfill for Walls Incl. Haul <br />20 <br />CY <br />$ 150.00 <br />$ 3,000.00 <br />$ 100.00 <br />$ 2,000.00 <br />$ 62.00 <br />$ 1,240.00 <br />$ 275.00 <br />$ 5,500.00 <br />A27 <br />Shoring or Extra Excavation Class B <br />16300 <br />Mill <br />$ 3.00 <br />$ 48,900.00 <br />$ 2.60 <br />$ 42,380.00 <br />$ 1.50 <br />$ 24,450.00 <br />$ 0.35 <br />$ 5,705.00 <br />A28 <br />Structure Excavation Class A Incl. Haul <br />270 <br />CY <br />$ 30.00 <br />$ 8,100.00 <br />$ 80.00 <br />$ 21,600.00 <br />$ 55.00 <br />$ 14,850.00 <br />$ 60.00 <br />$ 16,200.00 <br />A29 <br />Temporary Structural Shoring for Detention Vault <br />1 <br />® <br />$ 40,000.00 <br />$ 40,000.00 <br />$ 85,000.00 <br />$ 85,000.00 <br />$ 15,000.00 <br />$ 15,000.00 <br />$ 75,000.00 <br />$ 75,000.00 <br />A30 <br />Construction Geotextile for Permanent Erosion Control <br />150 <br />SY <br />$ 6.00 <br />$ 900.00 <br />$ 2.00 <br />$ 300.00 <br />$ 7.00 <br />$ 1,050.00 <br />$ 5.00 <br />$ 750.00 <br />A31 <br />Construction Geotextile for Separation <br />1120 <br />® <br />$ 6.00 <br />$ 6,720.00 <br />$ 3.00 <br />$ 3,360.00 <br />$ 2.25 <br />$ 2,520.00 <br />$ 4.00 <br />$ 4,480.00 <br />A32 <br />Construction Geotextile for Underground Drainage <br />240 <br />Ma= <br />$ 6.00 <br />$ 1,440.00 <br />$ 1.00 <br />$ 240.00 <br />$ 8.00 <br />$ 1,920.00 <br />$ 4.00 <br />$ 960.00 <br />A33 <br />Crushed Surfacing Top Course <br />870 <br />TON <br />$ 25.00 <br />$ 21,750.00 <br />$ 56.00 <br />$ 48,720.00 <br />$ 65.00 <br />$ 56,550.00 <br />$ 40.00 <br />$ 34,800.00 <br />A34 <br />Crushed Surfacing Base Course <br />2435 <br />TON <br />$ 25.00 <br />$ 60,875.00 <br />$ 40.00 <br />$ 97,400.00 <br />$ 43.00 <br />$ 104,705.00 <br />$ 36.00 <br />$ 87,660.00 <br />A35 <br />Ballast <br />® <br />TON <br />$ 20.00 <br />$ 700.00 <br />$ 150.00 <br />$ 5,250.00 <br />$ 66.00 <br />$ 2,310.00 <br />$ 111.00 <br />$ 3,885.00 <br />A36 <br />HMA Cl. 1/2 -inch PG 64 -22 <br />1125 <br />TON <br />$ 92.00 <br />$ 103,500.00 <br />$ 115.00 <br />$ 129,375.00 <br />$ 105.00 <br />$ 118,125.00 <br />$ 106.00 <br />$ 119,250.00 <br />A37 <br />HMA Cl. 1 -inch PG 64 -22 <br />MEI <br />TON <br />$ 92.00 <br />$ 130,180.00 <br />$ 97.00 <br />$ 137,255.00 <br />$ 88.00 <br />$ 124,520.00 <br />$ 100.00 <br />$ 141,500.00 <br />A38 <br />Pavement Repair Excavation Incl. Haul <br />300 <br />® <br />$ 12.00 <br />$ 3,600.00 <br />$ 52.00 <br />$ 15,600.00 <br />$ 13.00 <br />$ 3,900.00 <br />$ 33.00 <br />$ 9,900.00 <br />A39 <br />HMA for Pavement Repair Cl. 1/2 -inch PG 64 -22 <br />205 <br />TON <br />$ 150.00 <br />$ 30,750.00 <br />$ 150.00 <br />$ 30,750.00 <br />$ 135.00 <br />$ 27,675.00 <br />$ 150.00 <br />$ 30,750.00 <br />A40 <br />Planing Bitumious Pavement <br />®® <br />$ 10.00 <br />$ 3,150.00 <br />$ 25.00 <br />$ 7,875.00 <br />$ 20.00 <br />$ 6,300.00 <br />$ 20.00 <br />$ 6,300.00 <br />A41 <br />Cement Concrete Pavement <br />40 <br />® <br />$ 400.00 <br />$ 16,000.00 <br />$ 500.00 <br />$ 20,000.00 <br />$ 504.00 <br />$ 20,160.00 <br />$ 335.00 <br />$ 13,400.00 <br />A42 <br />Single Sloped Concrete Barrier <br />150 <br />LF <br />$ 100.00 <br />$ 15,000.00 <br />$ 125.00 <br />$ 18,750.00 <br />$ 141.00 <br />$ 21,150.00 <br />$ 165.00 <br />$ 24,750.00 <br />A43 <br />Gravel Backfill for Drain <br />30 <br />CY <br />$ 40.00 <br />$ 1,200.00 <br />$ 50.00 <br />$ 1,500.00 <br />$ 100.00 <br />$ 3,000.00 <br />$ 70.00 <br />$ 2,100.00 <br />City of Tukwila <br />42nd Ave S - Phase III <br />Bid Tab <br />4/11/2017 <br />