Certified Bid Tab
<br />40 -42nd Avenue S Phase 111 Project
<br />Marshbank Construction, Inc
<br />JR Hayes Corporation
<br />Northwest Cascade Inc.
<br />Ceccanti
<br />B5
<br />Gravel Borrow Incl. Haul
<br />3700
<br />CY
<br />40.00 $
<br />148,000.00
<br />$
<br />55.00 $
<br />203,500.00
<br />$ 12.00 $
<br />44,400.00
<br />$ 37.00 $
<br />136,900.00
<br />B6
<br />Temporary Structural Shoring for Culvert Footing
<br />1
<br />LS
<br />$ 170,000.00 $ 170,000.00
<br />$ 185,000.00 $ 185,000.00
<br />$ 208,500.00 $
<br />208,500.00
<br />$ 143,000.00 $
<br />143,000.00
<br />B7
<br />Conc. Class 4000 for Culvert Footing
<br />170
<br />CY
<br />$ 540.00 $
<br />91,800.00
<br />$ 600.00 $
<br />102,000,00
<br />$ 600.00 $
<br />102,000.00
<br />$ 400.00 • $ 68,000.00
<br />B8
<br />St. Reinf. Bar for Culvert Footing
<br />24000
<br />LBS
<br />2.00 $ 48,000.00
<br />1.00 $ 24,000.00
<br />1.86 $ 44,640.00
<br />1.00 $ 24,000.00
<br />B9
<br />St. Str. Plate Arch 10 Gage 16 ft. Span
<br />146
<br />LF
<br />$ 810.00 $
<br />118,260.00
<br />$ 1,300.00 $
<br />189,800.00
<br />$ 1,652.00 $
<br />241,192.00
<br />$ 800.00 $
<br />116, 800.00
<br />B10
<br />Steambed Boulders - One Man
<br />88
<br />TON
<br />$ 140.00 $
<br />12,320.00
<br />$ 150.00 $
<br />13,200.00
<br />$ 152.00 $
<br />13,376.00
<br />$ 68.00 $
<br />5,984.00
<br />B11
<br />Steambed Boulders - Two Man
<br />88
<br />TON
<br />$ 130.00 $
<br />11,440.00
<br />$ 150.00 $
<br />13,200.00
<br />$ 138.00 $
<br />12,144.00
<br />$
<br />68.00 $ 5,984.00
<br />B12
<br />Steambed Cobbles
<br />675
<br />TON
<br />$ 60.00 $ 40,500.00
<br />85.00 $ 57,375.00
<br />$
<br />61.00 $ 41,175.00
<br />34.00 $ 22,950.00
<br />B13
<br />Coarse Band
<br />3
<br />EA
<br />$ 3,800.00 $
<br />11,400.00
<br />$ 4,500.00 $
<br />13,500.00
<br />$ 2,400.00 $
<br />7,200.00
<br />$ 2,700.00 $
<br />8,100.00
<br />B14
<br />Temporary Stream Diversion
<br />1
<br />LS
<br />$ 31,000.00 $ 31,000.00
<br />$ 125,000.00 $ 125,000.00
<br />$ 25,600.00 $
<br />25,600.00
<br />$ 200,000.00 $ 200,000.00
<br />B15
<br />High Visibiliy Fence
<br />250
<br />LF
<br />$
<br />3.00 $ 750.00
<br />$
<br />4.00 $ 1,000.00
<br />3.00 $ 750.00
<br />2.00 $ 500.00
<br />B16
<br />Topsoil Type A (4" Depth)
<br />0.20
<br />ACRE
<br />$ 20,000.00 $ 4,000.00
<br />$ 26,000.00 $
<br />5,200.00
<br />$ 21,100.00 $
<br />4,220.00
<br />$ 23,000.00 $ 4,600.00
<br />B17
<br />Seed, Fertilize & Mulching (Native Seed Mix A)
<br />0.20
<br />ACRE
<br />$ 4,600.00 $
<br />920.00
<br />$ 4,500.00 $
<br />900.00
<br />$ 4,850.00 $
<br />970.00
<br />$ 4,000.00 $ 800.00
<br />B18
<br />Fine Compost (3" depth)
<br />0.20
<br />ACRE
<br />$ 20,000.00 $ 4,000.00
<br />$ 20,000.00 $
<br />4,000.00
<br />$ 21,100.00 $
<br />4,220.00
<br />$ 18,000.00 $ 3,600.00
<br />B19
<br />PSIPE, SALIX LASIANDRA ( #3)
<br />4
<br />EA
<br />$ 27.00 $ 108.00
<br />30.00 $ 120.00
<br />$ 28.00 $
<br />112.00
<br />$ 30.00 $ 120.00
<br />B20
<br />PSIPE, SALIX SCOULERIANA ( #3)
<br />4
<br />EA
<br />$ 27.00 $ 108.00
<br />30.00 $ 120.00
<br />28.00 $ 112.00
<br />$ 30.00 $ 120.00
<br />B21
<br />PSIPE, BETULA PAPYRIFERA ( #3)
<br />4
<br />EA
<br />$ 33.00 $ 132.00
<br />$
<br />30.00 $ 120.00
<br />35.00 $ 140.00
<br />$ 30.00 $ 120.00
<br />B22
<br />PSIPE, FRAXINUS LATIFOLIA ( #3)
<br />4
<br />EA
<br />$ 27.00 $ 108.00
<br />30.00 $ 120.00
<br />28.00 $ 112.00
<br />$ 30.00 $ 120.00
<br />B23
<br />PSIPE, THUJA PLICATA ( #3)
<br />4
<br />EA
<br />$ 33.00 $ 132.00
<br />$
<br />30.00 $ 120.00
<br />35.00 $ 140.00
<br />$ 30.00 $ 120.00
<br />B24
<br />PSIPE, TSUGA HETEROPHYLLA ( #3)
<br />4
<br />EA
<br />$ 41.00 $ 164.00
<br />30.00 $ 120.00
<br />$ 43.00 $
<br />172.00
<br />30.00 $ 120.00
<br />B25
<br />PSIPE, ALNUS RUBRA ( #3)
<br />4
<br />EA
<br />$ 31.00 $ 124.00
<br />30.00 $ 120.00
<br />$ 33.00 $
<br />132.00
<br />30.00 $ 120.00
<br />B26
<br />PSIPE, ACER CIRCINATUM ( #3)
<br />4
<br />EA
<br />$ 27.00 $ 108.00
<br />30.00 $ 120.00
<br />$
<br />28.00 $ 112.00
<br />$ 30.00 $ 120.00
<br />B27
<br />PSIPE, ACER MACROPHYLLUM ( #3)
<br />4
<br />EA
<br />$ 27.00 $ 108.00
<br />30.00 $ 120.00
<br />28.00 $ 112.00
<br />$ 30.00 $ 120.00
<br />B28
<br />PSIPE, PSEUDOTSUGA MENZIESII ( #3)
<br />4
<br />EA
<br />$ 31.00 $ 124.00
<br />30.00 $ 120.00
<br />$ 33.00 $
<br />132.00
<br />$ 30.00 $ 120.00
<br />B29
<br />PSIPE, PINUS CONTORTA ( #3)
<br />4
<br />EA
<br />$ 41.00 $ 164.00
<br />30.00 $ 120.00
<br />43.00 $ 172.00
<br />$ 30.00 $ 120.00
<br />B30
<br />PSIPE, CORNUS SERICEA ( #3)
<br />21
<br />EA
<br />$ 27.00 $ 567.00
<br />30.00 $ 630.00
<br />$ 28.00 $
<br />588.00
<br />$ 30.00 $
<br />630.00
<br />B31
<br />PSIPE, SAMBUCUS RACEMOSA ( #3)
<br />21
<br />EA
<br />$ 30.00 $ 630.00
<br />30.00 $ 630.00
<br />$ 32.00 $
<br />672.00
<br />30.00 $ 630.00
<br />B32
<br />PSIPE, MYRICA CALIFORNICA ( #3)
<br />21
<br />EA
<br />$ 45.00 $ 945.00
<br />$
<br />30.00 $ 630.00
<br />47.00 $ 987.00
<br />30.00 $ 630.00
<br />B33
<br />PSIPE, RIBES SANGUINEUM ( #3)
<br />23
<br />EA
<br />$ 27.00 $ 621.00
<br />30.00 $ 690.00
<br />28.00 $ 644.00
<br />30.00 $ 690.00
<br />B34
<br />PSIPE, HOLODISCUS DISCOLOR ( #3)
<br />24
<br />EA
<br />$ 31.00 $ 744.00
<br />30,00 $ 720.00
<br />33.00 $ 792.00
<br />30.00 $ 720.00
<br />B35
<br />PSIPE, SYMPHORICARPOS ALBUS ( #3)
<br />21
<br />EA
<br />$ 27.00 $ 567.00
<br />30.00 $ 630.00
<br />$
<br />28.00 $ 588.00
<br />$ 30.00 $ 630.00
<br />B36
<br />Temporary Irrigation System
<br />1
<br />LS
<br />$ 7,500.00 $
<br />7,500.00
<br />$ 10,000.00 $ 10,000.00
<br />$ 7,850.00 $
<br />7,850.00
<br />$ 12,000.00 $ 12,000.00
<br />B37
<br />Settlement Monitoring
<br />1
<br />LS
<br />$ 20,000.00 $ 20,000.00
<br />$ 6,000.00 $
<br />6,000.00
<br />$ 34,000.00 $
<br />34,000.00
<br />$ 15,000.00 $ 15,000.00
<br />B38
<br />Remove and Reset Streambank Boulders
<br />1
<br />LS
<br />$ 4,000.00 $
<br />4,000.00
<br />$ 10,000.00 $ 10,000.00
<br />$ 10,600.00 $
<br />10,600.00
<br />$ 2,500.00 $
<br />2,500.00
<br />B39
<br />Fish Exclusion
<br />FA
<br />$ 1,000.00 $
<br />1,000.00
<br />$ 1,000.00 $
<br />1,000.00
<br />$ 1,000.00 $
<br />1,000.00
<br />$ 1,000.00 $
<br />1,000.00
<br />Subtotal Schedule B
<br />$ 986,930.00
<br />$ 1,102,135.00
<br />$ 879,048.00
<br />$ 999,096.00
<br />Schedule C -- Power and Communications Undergrounding
<br />C1
<br />Unexpected Site Changes
<br />1
<br />FA
<br />$ 15,000.00 $
<br />15,000.00
<br />$ 15,000.00 $
<br />15,000.00
<br />$ 15,000.00 $
<br />15,000.00
<br />$ 15,000.00 $
<br />15,000.00
<br />C2
<br />Franchise Utility Coordination
<br />1
<br />FA
<br />$ 10,000.00 $ 10,000.00
<br />$ 10,000.00 $
<br />10,000.00
<br />$ 10,000.00 $
<br />10,000.00
<br />$ 10,000.00 $
<br />10,000.00
<br />C3
<br />Utility Potholing
<br />Joint Communications Ductbank
<br />1
<br />FA
<br />$ 15,000.00 $
<br />15,000.00
<br />$ 15,000.00 $
<br />15,000.00
<br />$ 15,000.00 $
<br />15,000.00
<br />$ 15,000.00 $
<br />15,000.00
<br />C4
<br />Structure Excavation Class B Incl. Haul for Joint Trench
<br />2200
<br />CY
<br />90.00 $
<br />198,000.00
<br />35.00 $
<br />77,000.00
<br />$ 43.50 $
<br />95,700.00
<br />$
<br />80.00 $
<br />176,000.00
<br />C5
<br />Shoring or Extra Excavation Class B for Joint Trench
<br />24000
<br />SF
<br />3.50 $
<br />84,000.00
<br />0.50 $
<br />12,000.00
<br />0.25 $
<br />6,000.00
<br />1.00 $
<br />24,000.00
<br />C6
<br />Joint Trench Pipe Zone Bedding, Including Haul
<br />400
<br />CY
<br />50.00 $ 20,000.00
<br />$ 120.00 $
<br />48,000.00
<br />62.00 $ 24,800.00
<br />$ 40.00 $ 16,000.00
<br />City of Tukwila
<br />42nd Ave S - Phase III
<br />Bid Tab
<br />4/11/2017
<br />
|