Laserfiche WebLink
Certified Bid Tab <br />40 -42nd Avenue S Phase 111 Project <br />Marshbank Construction, Inc <br />JR Hayes Corporation <br />Northwest Cascade Inc. <br />Ceccanti <br />B5 <br />Gravel Borrow Incl. Haul <br />3700 <br />CY <br />40.00 $ <br />148,000.00 <br />$ <br />55.00 $ <br />203,500.00 <br />$ 12.00 $ <br />44,400.00 <br />$ 37.00 $ <br />136,900.00 <br />B6 <br />Temporary Structural Shoring for Culvert Footing <br />1 <br />LS <br />$ 170,000.00 $ 170,000.00 <br />$ 185,000.00 $ 185,000.00 <br />$ 208,500.00 $ <br />208,500.00 <br />$ 143,000.00 $ <br />143,000.00 <br />B7 <br />Conc. Class 4000 for Culvert Footing <br />170 <br />CY <br />$ 540.00 $ <br />91,800.00 <br />$ 600.00 $ <br />102,000,00 <br />$ 600.00 $ <br />102,000.00 <br />$ 400.00 • $ 68,000.00 <br />B8 <br />St. Reinf. Bar for Culvert Footing <br />24000 <br />LBS <br />2.00 $ 48,000.00 <br />1.00 $ 24,000.00 <br />1.86 $ 44,640.00 <br />1.00 $ 24,000.00 <br />B9 <br />St. Str. Plate Arch 10 Gage 16 ft. Span <br />146 <br />LF <br />$ 810.00 $ <br />118,260.00 <br />$ 1,300.00 $ <br />189,800.00 <br />$ 1,652.00 $ <br />241,192.00 <br />$ 800.00 $ <br />116, 800.00 <br />B10 <br />Steambed Boulders - One Man <br />88 <br />TON <br />$ 140.00 $ <br />12,320.00 <br />$ 150.00 $ <br />13,200.00 <br />$ 152.00 $ <br />13,376.00 <br />$ 68.00 $ <br />5,984.00 <br />B11 <br />Steambed Boulders - Two Man <br />88 <br />TON <br />$ 130.00 $ <br />11,440.00 <br />$ 150.00 $ <br />13,200.00 <br />$ 138.00 $ <br />12,144.00 <br />$ <br />68.00 $ 5,984.00 <br />B12 <br />Steambed Cobbles <br />675 <br />TON <br />$ 60.00 $ 40,500.00 <br />85.00 $ 57,375.00 <br />$ <br />61.00 $ 41,175.00 <br />34.00 $ 22,950.00 <br />B13 <br />Coarse Band <br />3 <br />EA <br />$ 3,800.00 $ <br />11,400.00 <br />$ 4,500.00 $ <br />13,500.00 <br />$ 2,400.00 $ <br />7,200.00 <br />$ 2,700.00 $ <br />8,100.00 <br />B14 <br />Temporary Stream Diversion <br />1 <br />LS <br />$ 31,000.00 $ 31,000.00 <br />$ 125,000.00 $ 125,000.00 <br />$ 25,600.00 $ <br />25,600.00 <br />$ 200,000.00 $ 200,000.00 <br />B15 <br />High Visibiliy Fence <br />250 <br />LF <br />$ <br />3.00 $ 750.00 <br />$ <br />4.00 $ 1,000.00 <br />3.00 $ 750.00 <br />2.00 $ 500.00 <br />B16 <br />Topsoil Type A (4" Depth) <br />0.20 <br />ACRE <br />$ 20,000.00 $ 4,000.00 <br />$ 26,000.00 $ <br />5,200.00 <br />$ 21,100.00 $ <br />4,220.00 <br />$ 23,000.00 $ 4,600.00 <br />B17 <br />Seed, Fertilize & Mulching (Native Seed Mix A) <br />0.20 <br />ACRE <br />$ 4,600.00 $ <br />920.00 <br />$ 4,500.00 $ <br />900.00 <br />$ 4,850.00 $ <br />970.00 <br />$ 4,000.00 $ 800.00 <br />B18 <br />Fine Compost (3" depth) <br />0.20 <br />ACRE <br />$ 20,000.00 $ 4,000.00 <br />$ 20,000.00 $ <br />4,000.00 <br />$ 21,100.00 $ <br />4,220.00 <br />$ 18,000.00 $ 3,600.00 <br />B19 <br />PSIPE, SALIX LASIANDRA ( #3) <br />4 <br />EA <br />$ 27.00 $ 108.00 <br />30.00 $ 120.00 <br />$ 28.00 $ <br />112.00 <br />$ 30.00 $ 120.00 <br />B20 <br />PSIPE, SALIX SCOULERIANA ( #3) <br />4 <br />EA <br />$ 27.00 $ 108.00 <br />30.00 $ 120.00 <br />28.00 $ 112.00 <br />$ 30.00 $ 120.00 <br />B21 <br />PSIPE, BETULA PAPYRIFERA ( #3) <br />4 <br />EA <br />$ 33.00 $ 132.00 <br />$ <br />30.00 $ 120.00 <br />35.00 $ 140.00 <br />$ 30.00 $ 120.00 <br />B22 <br />PSIPE, FRAXINUS LATIFOLIA ( #3) <br />4 <br />EA <br />$ 27.00 $ 108.00 <br />30.00 $ 120.00 <br />28.00 $ 112.00 <br />$ 30.00 $ 120.00 <br />B23 <br />PSIPE, THUJA PLICATA ( #3) <br />4 <br />EA <br />$ 33.00 $ 132.00 <br />$ <br />30.00 $ 120.00 <br />35.00 $ 140.00 <br />$ 30.00 $ 120.00 <br />B24 <br />PSIPE, TSUGA HETEROPHYLLA ( #3) <br />4 <br />EA <br />$ 41.00 $ 164.00 <br />30.00 $ 120.00 <br />$ 43.00 $ <br />172.00 <br />30.00 $ 120.00 <br />B25 <br />PSIPE, ALNUS RUBRA ( #3) <br />4 <br />EA <br />$ 31.00 $ 124.00 <br />30.00 $ 120.00 <br />$ 33.00 $ <br />132.00 <br />30.00 $ 120.00 <br />B26 <br />PSIPE, ACER CIRCINATUM ( #3) <br />4 <br />EA <br />$ 27.00 $ 108.00 <br />30.00 $ 120.00 <br />$ <br />28.00 $ 112.00 <br />$ 30.00 $ 120.00 <br />B27 <br />PSIPE, ACER MACROPHYLLUM ( #3) <br />4 <br />EA <br />$ 27.00 $ 108.00 <br />30.00 $ 120.00 <br />28.00 $ 112.00 <br />$ 30.00 $ 120.00 <br />B28 <br />PSIPE, PSEUDOTSUGA MENZIESII ( #3) <br />4 <br />EA <br />$ 31.00 $ 124.00 <br />30.00 $ 120.00 <br />$ 33.00 $ <br />132.00 <br />$ 30.00 $ 120.00 <br />B29 <br />PSIPE, PINUS CONTORTA ( #3) <br />4 <br />EA <br />$ 41.00 $ 164.00 <br />30.00 $ 120.00 <br />43.00 $ 172.00 <br />$ 30.00 $ 120.00 <br />B30 <br />PSIPE, CORNUS SERICEA ( #3) <br />21 <br />EA <br />$ 27.00 $ 567.00 <br />30.00 $ 630.00 <br />$ 28.00 $ <br />588.00 <br />$ 30.00 $ <br />630.00 <br />B31 <br />PSIPE, SAMBUCUS RACEMOSA ( #3) <br />21 <br />EA <br />$ 30.00 $ 630.00 <br />30.00 $ 630.00 <br />$ 32.00 $ <br />672.00 <br />30.00 $ 630.00 <br />B32 <br />PSIPE, MYRICA CALIFORNICA ( #3) <br />21 <br />EA <br />$ 45.00 $ 945.00 <br />$ <br />30.00 $ 630.00 <br />47.00 $ 987.00 <br />30.00 $ 630.00 <br />B33 <br />PSIPE, RIBES SANGUINEUM ( #3) <br />23 <br />EA <br />$ 27.00 $ 621.00 <br />30.00 $ 690.00 <br />28.00 $ 644.00 <br />30.00 $ 690.00 <br />B34 <br />PSIPE, HOLODISCUS DISCOLOR ( #3) <br />24 <br />EA <br />$ 31.00 $ 744.00 <br />30,00 $ 720.00 <br />33.00 $ 792.00 <br />30.00 $ 720.00 <br />B35 <br />PSIPE, SYMPHORICARPOS ALBUS ( #3) <br />21 <br />EA <br />$ 27.00 $ 567.00 <br />30.00 $ 630.00 <br />$ <br />28.00 $ 588.00 <br />$ 30.00 $ 630.00 <br />B36 <br />Temporary Irrigation System <br />1 <br />LS <br />$ 7,500.00 $ <br />7,500.00 <br />$ 10,000.00 $ 10,000.00 <br />$ 7,850.00 $ <br />7,850.00 <br />$ 12,000.00 $ 12,000.00 <br />B37 <br />Settlement Monitoring <br />1 <br />LS <br />$ 20,000.00 $ 20,000.00 <br />$ 6,000.00 $ <br />6,000.00 <br />$ 34,000.00 $ <br />34,000.00 <br />$ 15,000.00 $ 15,000.00 <br />B38 <br />Remove and Reset Streambank Boulders <br />1 <br />LS <br />$ 4,000.00 $ <br />4,000.00 <br />$ 10,000.00 $ 10,000.00 <br />$ 10,600.00 $ <br />10,600.00 <br />$ 2,500.00 $ <br />2,500.00 <br />B39 <br />Fish Exclusion <br />FA <br />$ 1,000.00 $ <br />1,000.00 <br />$ 1,000.00 $ <br />1,000.00 <br />$ 1,000.00 $ <br />1,000.00 <br />$ 1,000.00 $ <br />1,000.00 <br />Subtotal Schedule B <br />$ 986,930.00 <br />$ 1,102,135.00 <br />$ 879,048.00 <br />$ 999,096.00 <br />Schedule C -- Power and Communications Undergrounding <br />C1 <br />Unexpected Site Changes <br />1 <br />FA <br />$ 15,000.00 $ <br />15,000.00 <br />$ 15,000.00 $ <br />15,000.00 <br />$ 15,000.00 $ <br />15,000.00 <br />$ 15,000.00 $ <br />15,000.00 <br />C2 <br />Franchise Utility Coordination <br />1 <br />FA <br />$ 10,000.00 $ 10,000.00 <br />$ 10,000.00 $ <br />10,000.00 <br />$ 10,000.00 $ <br />10,000.00 <br />$ 10,000.00 $ <br />10,000.00 <br />C3 <br />Utility Potholing <br />Joint Communications Ductbank <br />1 <br />FA <br />$ 15,000.00 $ <br />15,000.00 <br />$ 15,000.00 $ <br />15,000.00 <br />$ 15,000.00 $ <br />15,000.00 <br />$ 15,000.00 $ <br />15,000.00 <br />C4 <br />Structure Excavation Class B Incl. Haul for Joint Trench <br />2200 <br />CY <br />90.00 $ <br />198,000.00 <br />35.00 $ <br />77,000.00 <br />$ 43.50 $ <br />95,700.00 <br />$ <br />80.00 $ <br />176,000.00 <br />C5 <br />Shoring or Extra Excavation Class B for Joint Trench <br />24000 <br />SF <br />3.50 $ <br />84,000.00 <br />0.50 $ <br />12,000.00 <br />0.25 $ <br />6,000.00 <br />1.00 $ <br />24,000.00 <br />C6 <br />Joint Trench Pipe Zone Bedding, Including Haul <br />400 <br />CY <br />50.00 $ 20,000.00 <br />$ 120.00 $ <br />48,000.00 <br />62.00 $ 24,800.00 <br />$ 40.00 $ 16,000.00 <br />City of Tukwila <br />42nd Ave S - Phase III <br />Bid Tab <br />4/11/2017 <br />