City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
TIC 2017-06-27 COMPLETE AGENDA PACKET
COT-City
>
City Clerk
>
Council Committees
>
Transportation and Infrastructure (2017-2020)
>
Transportation and Infrastructure Agenda Packets (2017-Present)
>
2017-06-27 Transportation and Infrastructure
>
TIC 2017-06-27 COMPLETE AGENDA PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2021 12:29:50 PM
Creation date
6/22/2017 10:31:08 AM
Metadata
Fields
Template:
Council Committees
Committees Date (mm/dd/yy)
06/27/17
Committee Name
Transportation and Infrastructure 2017-2020
Record Type
Agenda Packet
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
2017 SDP - Contract for Construction Management Services <br />Akana <br />Harris & <br />Associates <br />d <br />O- <br />a <br />Drainage and paving project design /constuction experience <br />3 <br />3 <br />4 <br />Knowledge of State and Tukwila Standards and Procedures <br />4 <br />4 <br />5 <br />Environmental Experience <br />4 <br />3 <br />4 <br />Experience with similar local agency projects <br />4 <br />3 <br />5 <br />Past Postive Experience on City Drainage and Paving Projects <br />3 <br />3 <br />5 <br />Small Scale Projects <br />5 <br />3 <br />5 <br />Utilities Coordination <br />4 <br />4 <br />4 <br />Contruction Inspection <br />4 <br />3 <br />4 <br />TOTALS <br />31 <br />26 <br />36 <br />For each category, highest score is 5 (with the lowest score 1) <br />Consultant with the highest score is ranked the best. <br />Staff: Ryan Larson <br />Selection Date: 6/5/17 <br />Selected Consultant: KPG, Inc. <br />Selection Justification: KPG designed the project, has performed construction <br />management on other City projects. KPG has performed well on previous city drainage <br />and overlay projects in providing design and CM services. Based on overall score KPG <br />best meets the requirements of this project. <br />Ol <br />
The URL can be used to link to this page
Your browser does not support the video tag.