Laserfiche WebLink
CITY OF TUKWILA CAPITAL PROJECT SUMMARY <br />2017 to 2022 <br />PROJECT: <br />Baker Blvd Non - Motorized Improvements Project No. 91610409 <br />Design and construct non- motorized improvements on Baker Blvd from Andover Park West to Christensen Rd, <br />DESCRIPTION: <br />including bike lanes with a proposed road diet. Project will also construct previously designed non - motorized <br />improvement on Christensen Rd from Baker Blvd to the Green River trail. <br />JUSTIFICATION: <br />Improve non - motorized connections between the Tukwila Transit Center and Tukwila Station. <br />STATUS: <br />New project for the 2017 - 2022 CIP. <br />MAINT. IMPACT: <br />Minimal impact, project includes new sidewalk trail and pavement markings. <br />COMMENT: <br />Project is a component of the TUC /TOD Pedestrian Improvements. Grant funding by the King County Dept <br />� <br />.1 �.y <br />of Natural Resources and Parks. <br />FINANCIAL Through Estimated <br />(in S000's► 2015 2016 2017 2018 2019 2020 2021 2022 BEYOND TOTAL <br />EXPENSES <br />Project Location <br />Design <br />100 <br />� <br />.1 �.y <br />qb <br />100 <br />Land(R /W) <br />Y <br />M,� <br />0 <br />Const. Mgmt. <br />120 <br />T p <br />S 1 b 5 $ <br />f <br />120 <br />Construction <br />780 <br />780 <br />TOTAL EXPENSES <br />1 0 <br />0 <br />1,000 <br />1 0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />1,000 <br />FUND SOURCES <br />Awarded Grant <br />0 <br />King County <br />1,000 <br />1,000 <br />Mitigation Actual <br />0 <br />Traffic Impact Fees <br />0 <br />City Oper. Revenue <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />TOTAL SOURCES <br />0 <br />0 <br />1,000 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />1,000 <br />2017 - 2022 Capital Improvement Program 15 16 <br />Project Location <br />� <br />.1 �.y <br />qb <br />Y <br />M,� <br />_W7 � <br />�7 Auw rte, UT+Iy�juY CM � <br />WI4 Y <br />1'3 m <br />T p <br />S 1 b 5 $ <br />f <br />T. <br />al <br />� <br />io <br />J. <br />2017 - 2022 Capital Improvement Program 15 16 <br />