Laserfiche WebLink
Ce <br />ied Bid Tab <br />Baker Boulevard Non - Motorized Improvements Project <br />Engineer's Estimate <br />Road Construction Northwest <br />Active Construction <br />Bid Item No. <br />item Description <br />Quantity <br />Unit <br />Unit Price <br />Total Price <br />Unit Price <br />Total Price <br />Unit Price <br />Total Price <br />ROADWAY <br />1 <br />MOBILIZATION <br />1 <br />LS <br />$ 51,641.03 <br />$ 51,641.03 <br />$ 75,000.00 <br />$ 75,000.00 <br />$ 132,012.00 <br />$ 132,012.00 <br />2 <br />RESOLUTION OF UTILITY CONFLICTS <br />1 <br />EST <br />$ 7,500.00 <br />$ 7,500.00 <br />$ 7,500.00 <br />$ 7,500.00 <br />$ 7,500.00 <br />$ 7,500.00 <br />3 <br />TRAFFIC CONTROL LABOR, MIN. BID $ 35 PER HOUR <br />640 <br />HR <br />$ 45.00 <br />$ 28 800.00 <br />$ 70.00 <br />$ 44,80000 <br />$ . 70.00 <br />$ 44,800.00 <br />4 <br />PROJECT TEMPORARY TRAFFIC CONTROL <br />1 <br />LS <br />$ 14,920.00 <br />$ 14,920.00 <br />$ 20,000.00 <br />$ 20,000.00 <br />$ 11,000.00 <br />$ 11,000.00 <br />5 <br />UNEXPECTED SITE CHANGES <br />1 <br />EST <br />$ 20,000.00 <br />$ 20,000.00 <br />$ 20,000.00 <br />$ 20,000.00 <br />$ 20,000.00 <br />$ 20,000.00 <br />6 <br />ROADWAY SURVEYING <br />1 <br />LS <br />$ 15,000.00 <br />$ 15,000.00 <br />$ 10,000.00 <br />$ 10,000.00 <br />$ 9,000.00 <br />$ 9,000.00 <br />7 <br />SPCC PLAN <br />1 <br />LS <br />$ 2,000.00 <br />$ 2,000.00 <br />$ 1,200.00 <br />$ 1,200.00 <br />$ 150.00 <br />$ 150.00 <br />8 <br />CLEARING AND GRUBBING <br />1 <br />LS <br />$ 6,552.00 <br />$ 6,552.00 <br />$ 6,000.00 <br />$ 6,000.00 <br />$ 6,500.00 <br />$ 6,500.00 <br />9 <br />REMOVAL OF STRUCTURE AND OBSTRUCTION <br />1 <br />LS <br />$ 2,500.00 <br />$ 2,500.00 <br />$ 5,000.00 <br />$ 5,000.00 <br />$ 20,000.00 <br />$ 20,000.00 <br />10 <br />ROADWAY EXCAVATION INCL. HAUL <br />1 <br />LS <br />$ 23,000.00 <br />$ 23,000.00 <br />$ 37,500.00 <br />$ 37,500.00 <br />$ 35,000.00 <br />$ 35,000.00 <br />11 <br />GRAVEL BORROW INCL. HAUL <br />170 <br />TN <br />$ 10.00 <br />$ 1,670.00 <br />$ 25.00 <br />$ 4,250.00 <br />$ 40.00 <br />$ 6,800.00 <br />12 <br />CRUSHED SURFACING BASE COURSE <br />125 <br />TON <br />$ 30.00 <br />$ 3,750.00 <br />$ 60.00 <br />$ 7,500.00 <br />$ 83.00 <br />$ 10,375.00 <br />13 <br />CRUSHED SURFACING TOP COURSE <br />60 <br />TN <br />$ 35.00 <br />$ 2,100.00 <br />$ 60.00 <br />$ 3,600.00 <br />$ 50.00 <br />$ 3,000.00 <br />14 <br />HMA CI. 1/2 In. PG 64 -22 <br />120 <br />TON <br />$ 175.00 <br />$ 20,300.00 <br />$ 190.00 <br />$ 22,800.00 <br />$ 227.00 <br />$ 27,240.00 <br />15 <br />INLET PROTECTION <br />25 <br />EA <br />$ 110.00 <br />$ 2,750.00 <br />$ 85.00 <br />$ 2,125.00 <br />$ 90.00 <br />$ 2,250.00 <br />16 <br />EROSION/WATER POLLUTION CONTROL <br />1 <br />LS <br />$ 15,500.00 <br />$ 15,500.00 <br />$ 3,500.00 <br />$ 3,500.00 <br />$ 13,500.00 <br />$ 13,500.00 <br />17 <br />CEMENT CONC. TRAFFIC CURB AND GUTTER <br />900 <br />LF <br />$ 55.00 <br />$ 49,500.00 <br />$ 35.00 <br />$ 31,500.00 <br />$ 37.00 <br />$ 33,300.00 <br />18 <br />CEMENT CONC. PEDESTRIAN CURB <br />295 <br />LF <br />$ 45.00 <br />$ 13,275.00 <br />$ 34.00 <br />$ 10,030.00 <br />$ 44.00 <br />$ 12,980.00 <br />19 <br />ADJUST CATCH BASIN /MANHOLE TO GRADE <br />8 <br />EA <br />$ 575.00 <br />$ 4,600.00 <br />$ 750.00 <br />$ 6,000.00 <br />$ 900.00 <br />$ 7,200.00 <br />20 <br />ADJUST EXISTING UTILITY TO GRADE <br />2 <br />EA <br />$ 500.00 <br />$ 1,000.00 <br />$ 700.00 <br />$ 1,400.00 <br />$ 650.00 <br />$ 1,300.00 <br />$ 286,358.03 <br />$ 319,705.00 <br />$ 403,907.00 <br />SIDEWALK <br />21 <br />CEMENT CONC. DRIVEWAY ENTRANCE <br />45 <br />SY <br />$ 100.00 <br />$ 4,500.00 <br />$ 66.00 <br />$ 2,970.00 <br />$ 84.00 <br />$ 3,780.00 <br />22 <br />CEMENT CONC. SIDEWALK <br />670 <br />SY <br />$ 87.50 <br />$ 58,625.00 <br />$ 52.00 <br />$ 34,840.00 <br />$ 56.00 <br />$ 37,520.00 <br />23 <br />DECORATIVE CEMENT CONC. FINISH TYPE 2 <br />6 <br />SY <br />$ 1,000.00 <br />$ 6,000.00 <br />$ 335.00 <br />$ 2,010.00 <br />$ 490.00 <br />$ 2,940.00 <br />24 <br />CEMENT CONC. CURB RAMP <br />12 <br />EA <br />$ 1,406.25 <br />$ 16,875.00 <br />$ 2,750.00 <br />$ 33,000.00 <br />$ 3,200.00 <br />$ 38,400.00 <br />25 <br />INSTALL OWNER- PROVIDED BIKE RACK <br />2 <br />EA <br />$ 500.00 <br />$ 1,000.00 <br />$ 1,500.00 <br />$ 3,000.00 <br />$ 650.00 <br />$ 1,300.00 <br />26 <br />NON -SKID SURFACE TREATMENT <br />1 <br />LS <br />$ 2,000.00 <br />$ 2,000.00 <br />$ 1,000.00 <br />$ 1,000.00 <br />$ 4,000.00 <br />$ 4,000.00 <br />27 <br />PAVEMENT EDGE GUIDE <br />12 <br />LF <br />$ 25.00 <br />$ 300.00 <br />$ 300.00 <br />$ 3,600.00 <br />$ 117.00 <br />$ 1,404.00 <br />$ 89,300.00 <br />$ 80,420.00 <br />$ 89,344.00 <br />TRAFFIC CONTROL DEVICES <br />28 <br />REMOVING PAVEMENT MARKINGS <br />1 <br />LS <br />$ 5,000.00 <br />$ 5,000.00 <br />$ 3,300.00 <br />$ 3,300.00 <br />$ 3,500.00 <br />$ 3,500.00 <br />29 <br />PLASTIC LINE <br />2400 <br />LF <br />$ 10.00 <br />$ 23,900.00 <br />$ 4.50 <br />$ 10,800.00 <br />$ 5.00 <br />$ 12,000.00 <br />30 <br />PLASTIC 6 IN LINE <br />650 <br />SF <br />$ 14.00 <br />$ 9,100.00 <br />$ 6.75 <br />$ 4,387.50 <br />$ 7.00 <br />$ 4,550.00 <br />31 <br />PLASTIC GREEN LINE <br />4400 <br />SF <br />$ 10.00 <br />$ 43,850.00 <br />$ 11.20 <br />$ 49,280.00 <br />$ 11.00 <br />$ 48,400.00 <br />32 <br />PLASTIC CROSSWALK LINE <br />850 <br />SF <br />$ 7.00 <br />$ 5,950.00 <br />$ 9.75 <br />$ 8,287.50 <br />$ 10.00 <br />$ 8,500.00 <br />33 <br />PLASTIC STOP LINE <br />130 <br />LF <br />$ 14.00 <br />$ 1,540.00 <br />$ 17.00 <br />$ 2,210.00 <br />$ 17.00 <br />$ 2,210.00 <br />34 <br />PLASTIC BICYCLE LANE SYMBOL <br />23 <br />EA <br />$ 200.00 <br />$ 4,600.00 <br />$ 325.00 <br />$ 7,475.00 <br />$ 350.00 <br />$ 8,050.00 <br />35 <br />PLASTIC TRAFFIC ARROW <br />16 <br />EA <br />$ 200.00 <br />$ 3,200.00 <br />$ 300.00 <br />$ 4,800.00 <br />$ 300.00 <br />$ 4,800.00 <br />36 <br />PLASTIC TRAFFIC LETTER <br />7 <br />EA <br />$ 200.00 <br />$ 1,400.00 <br />$ 125.00 <br />$ 875.00 <br />$ 130.00 <br />$ 910.00 <br />37 <br />RAISED PAVEMENT MARKER TYPE 1 <br />9 <br />HUND <br />$ 400.00 <br />$ 3,480.00 <br />$ 350.00 <br />$ 3,150.00 <br />$ 350.00 <br />$ 3,150.00 <br />38 <br />RAISED PAVEMENT MARKER TYPE 2 <br />2 <br />HUND <br />$ 500.00 <br />$ 600.00 <br />$ 425.00 <br />$ 850.00 <br />$ 450.00 <br />$ 900.00 <br />39 <br />PERMANENT SIGNING <br />1 <br />LS <br />$ 5,000.00 <br />$ 5,000.00 <br />$ 15,000.00 <br />$ 15,000.00 <br />$ 12,000.00 <br />$ 12,000.00 <br />$ 107,620.00 <br />$ 110,415.00 <br />$ 108,970.00 <br />ROADSIDE DEVELOPMENT <br />40 <br />PROPERTY RESTORATION <br />1 <br />EST <br />$ 5,000.00 <br />$ 5,000.00 <br />$ 5,000.00 <br />$ 5,000.00 <br />$ 5,000.00 <br />$ 5,000.00 <br />41 <br />TOPSOIL TYPE A <br />90 <br />CY <br />$ 62.50 <br />$ 6,875.00 <br />$ 47.00 <br />$ 4,230.00 <br />$ 56.00 <br />$ 5,040.00 <br />City of Tukwila <br />42nd Ave S - Phase III <br />Bid Tab 6/20/2017 <br />