City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
TIC 2017-07-25 Item 2D - Contract Supplement #2 - 2017 Overlay and Repair Program Construction Management with KPG Inc
COT-City
>
City Clerk
>
Council Committees
>
Transportation and Infrastructure (2017-2020)
>
Transportation and Infrastructure Agenda Packets (2017-Present)
>
2017-07-25 Transportation and Infrastrcuture
>
TIC 2017-07-25 Item 2D - Contract Supplement #2 - 2017 Overlay and Repair Program Construction Management with KPG Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2021 12:29:51 PM
Creation date
7/20/2017 9:50:28 AM
Metadata
Fields
Template:
Council Committees
Committees Date (mm/dd/yy)
07/25/17
Committee Name
Transportation and Infrastructure 2017-2020
Record Type
Agenda Packet
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Exhibit B -2 <br />Consultant Fee Determination <br />Project Name: 2017 Overlay Program <br />Supplement No. 2 - Additional Design and <br />Construction Services <br />Consultant: IMF <br />COST PLUS FIXED FEE <br />Classification <br />Hours <br />Rate <br />Cost <br />Resident Engineer <br />28 <br />$ <br />66.00 <br />$ <br />1,848 <br />Senior Engineer <br />224 <br />$ <br />52.88 <br />$ <br />11,845 <br />Project Engineer <br />104 <br />$ <br />43.27 <br />$ <br />4,500 <br />Design Engineer <br />8 <br />$ <br />37.60 <br />$ <br />301 <br />CAD Technician <br />20 <br />$ <br />31.90 <br />$ <br />638 <br />Construction Inspector <br />544 <br />$ <br />38.00 <br />$ <br />20,672 <br />Survey Crew <br />0 <br />$ <br />60.00 <br />$ <br />- <br />Document Specialist <br />176 <br />$ <br />40.87 <br />$ <br />7,193 <br />Office Admin <br />80 <br />$ <br />26.92 <br />$ <br />2,154 <br />Total Direct Salary Cost (DSC) <br />1,184 <br />$49,151 <br />Overhead (138.02% x DSC) <br />$67,837.82 <br />Fixed Fee (30% x DSC) <br />$14,745.22 <br />Subtotal: <br />$131,733.76 <br />REIMBURSABLES <br />Construction Vehicle Mileage $1,000 <br />Miscellaneous - Repro, Field Supplies $1,500 <br />Subtotal: $2,500 <br />SUBCONSULTANT COSTS <br />Material Testing Allowance $25,000 <br />Subtotal: $25,000 <br />TOTAL <br />$ 159,233.76 <br />CM <br />
The URL can be used to link to this page
Your browser does not support the video tag.