City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
TIC 2017-07-25 Item 2D - Contract Supplement #2 - 2017 Overlay and Repair Program Construction Management with KPG Inc
COT-City
>
City Clerk
>
Council Committees
>
Transportation and Infrastructure (2017-2020)
>
Transportation and Infrastructure Agenda Packets (2017-Present)
>
2017-07-25 Transportation and Infrastrcuture
>
TIC 2017-07-25 Item 2D - Contract Supplement #2 - 2017 Overlay and Repair Program Construction Management with KPG Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2021 12:29:51 PM
Creation date
7/20/2017 9:50:28 AM
Metadata
Fields
Template:
Council Committees
Committees Date (mm/dd/yy)
07/25/17
Committee Name
Transportation and Infrastructure 2017-2020
Record Type
Agenda Packet
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
EXHIBIT A -2 <br />Additional Design and Construction <br />Management Services <br />Scope of Work <br />July 7, 2017 <br />City of Tukwila — 2017 Overlay Program <br />This work will provide additional design for one (1) additional overlay site on 42nd Avenue S, <br />preparation of revised bid documents for re -bid, and construction management services for the <br />construction contract to complete the City of Tukwila — 2017 Overlay Program. These services will <br />include preparation of bid documents, bid period services, design support, project management, <br />documentation control, inspection, materials testing, public involvement, and contract <br />administration during the construction of the project, as detailed below. KPG ( "Consultant ") will provide <br />to the City of Tukwila ( "City ") construction management services for the project. <br />A detailed scope for the Contract follows: <br />I. INTRODUCTION <br />The following scope of services and associated costs are based upon the assumptions outlined below. <br />General Assumptions: <br />• The proposed project team will include one part-time documentation control specialist, a <br />part-time resident engineer during construction activities, a full -time inspector, an additional <br />inspector if required, sub - consultants to provide services for materials testing, and other <br />supporting tasks as deemed necessary. It is anticipated that full- time site observation will be <br />required for the entirety of the project. <br />• The level of service is based on a construction project duration of approximately 40 working <br />days. <br />• KPG estimates a total project construction duration of 60 working days (12 weeks) including <br />preconstruction service, construction services, and project closeout. No suspensions or stop <br />work periods are anticipated during this duration. <br />• It is anticipated that the KPG will develop the Record of Materials (ROM). This scope of services <br />provides the management of the ROM and scheduling of required materials testing respectively. <br />• It is anticipated that the City will review and execute the insurance, bonds, and the Construction <br />Contract. <br />• KPG will do all public outreach, and ensure affected business and residents are notified of <br />impending contractor activities one week prior to work by door to door and or A -board signs <br />City of Tukwila — 2017 Overlay Program Page 2 of 7 KPG <br />Construction Management Services Project Number 16101 <br />Scope of Work 717117 <br />27 <br />
The URL can be used to link to this page
Your browser does not support the video tag.