City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
TIC 2017-07-25 Item 2D - Contract Supplement #2 - 2017 Overlay and Repair Program Construction Management with KPG Inc
COT-City
>
City Clerk
>
Council Committees
>
Transportation and Infrastructure (2017-2020)
>
Transportation and Infrastructure Agenda Packets (2017-Present)
>
2017-07-25 Transportation and Infrastrcuture
>
TIC 2017-07-25 Item 2D - Contract Supplement #2 - 2017 Overlay and Repair Program Construction Management with KPG Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2021 12:29:51 PM
Creation date
7/20/2017 9:50:28 AM
Metadata
Fields
Template:
Council Committees
Committees Date (mm/dd/yy)
07/25/17
Committee Name
Transportation and Infrastructure 2017-2020
Record Type
Agenda Packet
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
EXHIBIT A -2 <br />TASK 3 — PRECONSTRUCTION SERVICES <br />3.1 Preconstruction Conference: The Consultant will prepare an agenda for, distribute notices of, <br />and conduct a preconstruction conference in the City's offices. The Consultant's project <br />manager, resident engineer, inspector, and document control specialist will attend the <br />preconstruction conference. The Consultant will prepare a written record of the meeting and <br />distribute copies of the minutes to all attendees and affected agencies, staff, etc. <br />At the Pre - construction conference, the Consultant shall facilitate discussions with the <br />Contractor concerning the plans, specifications, schedules, issues with utilities, unusual <br />conditions, Federal, State, and local requirements and any other items that will result in better <br />project understanding among the parties involved. <br />Deliverables <br />• Preconstruction conference agenda with meeting minutes <br />TASK 4 — CONSTRUCTION SERVICES - FIELD <br />4.1 On -site Observation: The Consultant shall provide the services of one full time <br />inspector during construction activities and other tasks necessary to monitor the progress <br />of the work. An additional inspector, may be incorporated as dictated by the Contractor's <br />approach to the Work. Construction staff shall oversee the following items of work, on <br />theproject site, and will observe the technical progress of the construction, including <br />providing day -to -day contact with the Contractor and the City: <br />• Preparation to include mobilization and clearing and grubbing <br />• Erosion Control <br />• HMA grinding and paving <br />• Driveways, curb, gutter and sidewalk <br />• And all incidental items necessary to complete the Work as described in the Plans <br />and /or Specifications. <br />Field inspection staff will perform the following duties as a matter of their daily activities: <br />L Observe technical conduct of the construction, including providing day -to -day contact <br />with construction contractor, City, utilities, and other stakeholders, and monitor for <br />adherence to the Contract Documents. The Consultant's personnel will act in <br />accordance with Sections 1 -05.1 and 1 -05.2 of the Standard Specifications. <br />ii. Observe material, workmanship, and construction areas for compliance with the <br />Contract Documents and applicable codes, and notify construction contractor of <br />noncompliance. Advise the City of any non - conforming work observed during site visits. <br />iii. Document all material delivered to the job site in accordance with the contract <br />documents. <br />iv. Prepare daily inspection reports, recording the construction contractor's operations as <br />actually observed by the Consultant; includes quantities of work placed that day, <br />contractor's equipment and crews, and other pertinent information. <br />V. Interpret Contract Documents in coordination with the City and KPG. <br />vi. Resolve questions which may arise as to the quality and acceptability of material <br />City of Tukwila — 2017 Overlay Program Page 4 of 7 KPG <br />Construction Management Services Project Number 16101 <br />Scope of Work 717117 <br />29 <br />
The URL can be used to link to this page
Your browser does not support the video tag.