City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
TIC 2017-07-25 Item 2E - Agreement - 42nd Avenue South Phase III with Seattle City Light
COT-City
>
City Clerk
>
Council Committees
>
Transportation and Infrastructure (2017-2020)
>
Transportation and Infrastructure Agenda Packets (2017-Present)
>
2017-07-25 Transportation and Infrastrcuture
>
TIC 2017-07-25 Item 2E - Agreement - 42nd Avenue South Phase III with Seattle City Light
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2021 12:29:51 PM
Creation date
7/20/2017 9:51:08 AM
Metadata
Fields
Template:
Council Committees
Committees Date (mm/dd/yy)
07/25/17
Committee Name
Transportation and Infrastructure 2017-2020
Record Type
Agenda Packet
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of Tukwila <br />Allan Ekberg, Mayor <br />INFORMATIONAL MEMORANDUM <br />TO: Transportation and Infrastructure Committee <br />FROM: Bob Giberson, Public Works Director, 46 <br />BY: Cyndy Knighton, Senior Program Manager <br />CC: Mayor Ekberg <br />DATE: July 21, 2017 <br />SUBJECT: 42nd Avenue S Phase III <br />Project No. 99410303 <br />Memorandum of Agreement with Seattle City Light/City of Seattle <br />ISSUE <br />Enter into an agreement with Seattle City Light/City of Seattle (SCL) for the construction cost sharing to <br />underground the electrical distribution system as part of the 42nd Ave S Phase III project. <br />BACKGROUND <br />In February 2012, CH2MHill began design work on a project combining the 42nd Ave S (Southcenter Blvd <br />to S 1601h St) roadway project and the Gilliam Creek culvert replacement project. Originally, the project <br />was not going to include undergrounding of aerial utilities, but an opportunity for cost sharing with SCL <br />came about in 2015. The design was updated to include undergrounding and negotiations between staff <br />at Tukwila and SCL resulted in the attached Memorandum of Agreement. <br />ANALYSIS <br />The costs to underground the electrical distribution system will be split with SCL responsible for 60% of <br />the cost and Tukwila responsible for 40 %. Costs for the aerial conversion are divided into two distinct <br />types of work: Civil Infrastructure costs and Underground Electrical System (UES) costs. Civil costs cover <br />the work to install the physical infrastructure (e.g. vaults and conduit) while UES costs are for the work <br />and materials to pull the cabling through the infrastructure and connect and energize the new system. <br />Agency <br />Civil Cost <br />Underground Electrical System Cost <br />Total <br />SCL( 60%) _..........I. .................. <br />Tukwila 40% <br />_.........................$ 755. 2. 1.. 4........................................._......................... <br />$503,476 <br />..............................$ 530,, 098......._................................ .........................._.... <br />$353,399 <br />_.... ._................$1,285.3 _2.. <br />$856,875 <br />Total <br />$1,258,690 <br />$883,497 <br />$2,142,187 <br />The costs shown in the above table reflect the MOA language and the results from the actual contractor's <br />bid. The final costs will be adjusted to reflect all related costs incurred for the construction, but the share <br />will be split with the 60/40 cost share ratio. <br />FINANCIAL IMPACT <br />The ultimate cost to Tukwila to underground the electrical system is anticipated to be $856,875 based on <br />the bid proposal and the UES costs projected by SCL. The anticipated reimbursement amount from SCL <br />is $1,285,312. The cost sharing with SCL does not include all costs for the aerial conversion, only those <br />specifically identified in the MOA as shared costs. Trenching and backfill costs are examples of work to <br />be performed entirely at the City's expense. <br />RECOMMENDATION <br />The Council is being asked to authorize the Mayor to execute the Memorandum of Agreement and <br />consider this item at the August 7, 2017 Regular Meeting on the Consent Agenda. <br />Attachments: Memorandum of Agreement by and between the City of Seattle and City of Tukwila <br />Page 2, 2017 CIP <br />w:\pw eng\projects \a- rw & rs projects \42nd ave s phase iii (99410303 94 -rs03) \design \undergrounding \information memo - scl moa 7- 21- 17.docx 37 <br />