City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
TIC 2017-07-25 Item 2E - Agreement - 42nd Avenue South Phase III with Seattle City Light
COT-City
>
City Clerk
>
Council Committees
>
Transportation and Infrastructure (2017-2020)
>
Transportation and Infrastructure Agenda Packets (2017-Present)
>
2017-07-25 Transportation and Infrastrcuture
>
TIC 2017-07-25 Item 2E - Agreement - 42nd Avenue South Phase III with Seattle City Light
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2021 12:29:51 PM
Creation date
7/20/2017 9:51:08 AM
Metadata
Fields
Template:
Council Committees
Committees Date (mm/dd/yy)
07/25/17
Committee Name
Transportation and Infrastructure 2017-2020
Record Type
Agenda Packet
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Section 5. Staffing <br />Primary project contacts will be as follows as of execution of this <br />Agreement: <br />City of Tukwila <br />Cyndy Knighton (design) Mike Ronda (construction) <br />Sr. Program Manager Project Manager <br />6300 Southcenter Blvd, Ste 100 6300 Southcenter Blvd, Ste 100 <br />Tukwila, WA 98188 Tukwila, WA 98188 <br />(206) 431 -2450 (206) 431 -2454 <br />Section 6. Construction <br />City Light <br />Joe Hampton <br />Sr. Project Manager <br />PO Box 34023 <br />Seattle, WA 98124 <br />(206) 684 -5046 <br />6.1 Civil Infrastructure: Tukwila will construct the Civil Infrastructure in accordance with the <br />plans and specifications, and any revisions thereto, approved by City Light and as <br />otherwise provided herein. <br />6.2 Private Property Infrastructure: <br />6.2.1. Tukwila will contact and coordinate with property owners and customers within the <br />Conversion Area (as identified by City Light) to facilitate the timely completion of <br />the Private Property Infrastructure Work. <br />6.2.2. In furtherance of the Private Property Infrastructure Work, Tukwila intends to seek <br />agreement from each such customer /property owner which agreement will either: <br />(1) authorize Tukwila, and Tukwila's consultants and contractors, to perform some <br />or all of the Private Property Infrastructure Work, or (2) provide that the private <br />property owner will perform or cause to be performed the Private Property <br />Infrastructure Work. All Private Property Infrastructure work necessary for City <br />Light to complete its underground service connection work to those properties in <br />the Conversion Area will be completed by Tukwila, Tukwila's consultants or <br />contractors, or the private property owners per RCW 35.96.050 prior to Operational <br />Acceptance of the Civil Infrastructure by City Light. <br />6.2.3. City Light shall intercept and connect the service in the secondary handhole. The <br />contractor performing the Private Property Infrastructure Work shall coordinate <br />each service cutover work with the City Light electric service representative, five <br />(5) working days in advance of the cutover. <br />6.3 Aerial Infrastructure Removal Project: <br />6.3.1. City Light will perform the work necessary to complete the Aerial Infrastructure <br />Removal Project in accordance with the Project Schedule and as set forth in Section <br />4.3 of this Agreement. <br />City of Tukwila - 42nd Ave S Phase III Undergrounding Agreement <br />Page 11 of 17 <br />FINAL <br />EN <br />
The URL can be used to link to this page
Your browser does not support the video tag.