City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
TIC 2017-07-25 Item 2E - Agreement - 42nd Avenue South Phase III with Seattle City Light
COT-City
>
City Clerk
>
Council Committees
>
Transportation and Infrastructure (2017-2020)
>
Transportation and Infrastructure Agenda Packets (2017-Present)
>
2017-07-25 Transportation and Infrastrcuture
>
TIC 2017-07-25 Item 2E - Agreement - 42nd Avenue South Phase III with Seattle City Light
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2021 12:29:51 PM
Creation date
7/20/2017 9:51:08 AM
Metadata
Fields
Template:
Council Committees
Committees Date (mm/dd/yy)
07/25/17
Committee Name
Transportation and Infrastructure 2017-2020
Record Type
Agenda Packet
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
resources to adequately and timely inspect the progress of work so as to conform to <br />the work plan as updated at the weekly construction meetings as provided for in <br />Section 4.3.2.1. City Light further agrees that the City Light Project Manager or <br />designee will regularly attend the weekly construction meetings for the Project. In <br />the event that City Light inspectors identify work or materials that are not in <br />accordance with the approved plans and specifications, City Light shall immediately <br />notify the Tukwila Construction Engineer and provide a detailed description of the <br />non - conformance or defect in work or materials. Except in cases of a Force Majeure <br />Event as defined in Section 4. 10, any work not adequately and timely inspected by <br />City Light will be considered to be accepted, provided that the work is in accordance <br />with the work plan established in the weekly construction meeting. <br />6.5 Field Directive Change(s): Each party agrees to immediately notify the other party in <br />writing of any potential field design revisions and /or changes affecting the other's facilities. <br />All changes to the approved plans and specifications, and amendments thereto, that involve <br />work related to the Underground Electrical System and /or Civil Infrastructure require <br />notification and approval by and acknowledgement of both Parties. Any costs associated <br />with work completed to the Underground Electrical System or Civil Infrastructure outside <br />of the mutually approved plans and specifications and approved amendments thereto <br />without City Light approval will be Tukwila's responsibility. All changes to the <br />Underground Electrical System and /or the Civil Infrastructure not necessary for the Work <br />approved by the City Light Project Manager or other authorized representative shall be <br />reimbursable to Tukwila. If consensus cannot be found see section 4.8 for resolution. <br />6.6 Operational Acceptance. Tukwila's City Engineer or designated representative will be <br />notified by City Light in writing of Operational Acceptance, with any exceptions, before <br />City Light will commence installation of the Underground Electrical System. Once City <br />Light issues Operational Acceptance for the Civil Infrastructure, City Light will then <br />commence placement of cable along with the cutover of existing services. Tukwila and its <br />Contractor will maintain physical ownership of the Civil Infrastructure and will repair or <br />replace any damaged structure at their expense, unless such damage was caused by City <br />Light or its contractors or subcontractors. The Contractor or its Subcontractor will continue <br />to complete the duct bank punch list and both Tukwila's Engineer and the City Light <br />Inspector will continue to verify that the open items are being completed. In accordance <br />with Section 4.3.3 of this Agreement, City Light will assume ownership and control of <br />Civil Infrastructure upon Final Acceptance. <br />6.7 Duct Bank. Once the duct bank is 100% complete and all vault and hand hole lids brought <br />to grade, a final walk through will be scheduled by Tukwila with the City Light inspector <br />and with Tukwila's Engineer and Contractor. After all punch list items are completed and <br />as -built drawings have been submitted to and accepted by City Light, City Light will <br />provide a letter of Final Acceptance of Schedule Work to Tukwila's Engineer. Tukwila's <br />Engineer or designee will notify the Contractor that the Schedule Work has been completed <br />and Tukwila has received Final Acceptance from City Light. <br />6.8 Street Lighting and Signals: City Light and Tukwila will select service points for the Street <br />Lighting System designed by Tukwila's Consultant. City Light will install wiring between <br />its power source and the service points and make final connections to energize the systems. <br />City of Tukwila - 42nd Ave S Phase III Undergrounding Agreement <br />Page 13 of 17 <br />FINAL <br />
The URL can be used to link to this page
Your browser does not support the video tag.