City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
TIC 2017-07-25 Item 2E - Agreement - 42nd Avenue South Phase III with Seattle City Light
COT-City
>
City Clerk
>
City Council Committees Meetings
>
Previous Committees
>
Transportation and Infrastructure (2017-2020)
>
Transportation and Infrastructure Agenda Packets (2017-2020)
>
2017 Transportation and Infrastructure Packets
>
2017-07-25 Transportation and Infrastrcuture
>
TIC 2017-07-25 Item 2E - Agreement - 42nd Avenue South Phase III with Seattle City Light
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2021 12:29:51 PM
Creation date
7/20/2017 9:51:08 AM
Metadata
Fields
Template:
Council Committees
Committees Date β(mm/dd/yy)β
07/25/17
Committee Name
Transportation and Infrastructure 2017-2020
Record Type
Agenda Packet
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Exhibit B <br />T&M Estimate cost f <br />--/ <br />ESTIMATES NOTES (SCOPE) <br />Reg. Hours <br />Labour Cost <br />Material Cost <br />Engineering (Civil const. plan review & Elect. Design) <br />Inspection (Civil & Elect. Inspection) <br />Subtotal <br />A. SCR ,..R..]'i SRRRJRCE CRIRSrRUCTR:i',:- CCRRT 'TiS;111-/Y,!βI.E-: This <br />estimate does include UG service construction work. 25 services to be <br />converted OH-UG plus removal cost <br />656 <br />$99,091 <br />$39,636.45 <br />$29,727.34 <br />$168,455 <br />B. !RC ',, i..i.:.3 ::R-.71[:;:7) "RR CO i:-..c''Riβ1-:C.R.:;RON CC,RR EST'::c,;(:RC(13 This <br />estimate does include primary and feeder work ( this includes PMH <br />switch installation work), removal work plus all material cost. <br />1482 <br />$223,163 <br />$197,450 <br />$168,245.25 <br />.$126,183.93 <br />$715,042 <br />Total before contingencies <br />2138 <br />$322,254.00 <br />197450 <br />$207,882 <br />$155,911.27 <br />$883,497 <br />Total plus added Contingencies (Design plus Construction=80%) <br />$1,590,294.55 <br />Note: This estimate includes wage & Material escalations since the last <br />updated date (7/7/2014) of the estimate sheet among other % <br />incrementals as shown on summary sheet. TT 5/25/2017 <br />
The URL can be used to link to this page
Your browser does not support the video tag.