City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
TIC 2017-07-25 Item 2F - Grant Application - Transportation Improvement Board for West Valley Highway (I-405 to Strander Boulevard)
COT-City
>
City Clerk
>
Council Committees
>
Transportation and Infrastructure (2017-2020)
>
Transportation and Infrastructure Agenda Packets (2017-Present)
>
2017-07-25 Transportation and Infrastrcuture
>
TIC 2017-07-25 Item 2F - Grant Application - Transportation Improvement Board for West Valley Highway (I-405 to Strander Boulevard)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2021 12:29:51 PM
Creation date
7/20/2017 9:51:18 AM
Metadata
Fields
Template:
Council Committees
Committees Date (mm/dd/yy)
07/25/17
Committee Name
Transportation and Infrastructure 2017-2020
Record Type
Agenda Packet
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF TUKWILA CAPITAL PROJECT SUMMARY <br />2017 to 2022 <br />PROJECT: <br />West Valley Hwy (1-405 - Strander Blvd) Project No. 99310410 <br />DESCRIPTION: <br />Design and construct completion of 7 lane sections of West Valley Hwy with curbs, gutters, storm drainage, <br />lighting and traffic control, including safety and capacity improvements at the S 156th St intersection. <br />JUSTIFICATION: <br />Safety and capacity items need completion. Portions have been completed by development. <br />STATUS: <br />Combined with W Valley Hwy /S 156th Intersection in 2017. Continuing to work with development. May be <br />completed in phases; Longacres to S 156th St and then S 156th St to 1 -405. <br />MAINT. IMPACT: <br />Reduced maintenance. <br />Project is on Traffic Impact Fee List. Grants from Federal STP awarded for $627k that includes $112k for <br />COMMENT: <br />design of sidewalk /bike path on Longacres Way (S 158th St) and proposed State Transportation Improvement <br />Board grant of $1.3m for 2018/2019. <br />FINANCIAL Through Estimated <br />(in 1000'sl 2015 2016 2017 201R 2019 2020 2021 2022 RFYnNn TnTAI <br />EXPENSES <br />Project Location, <br />y <br />Design <br />16 <br />382 <br />Sts St h� <br />150 <br />548 <br />Land (RAN) <br />` <br />100 <br />Twiwiy <br />1 <br />100 <br />200 <br />Const. Mgmt. <br />5 1 <br />270 <br />150 <br />420 <br />Construction <br />1,800 <br />1,000 <br />2,800 <br />TOTAL EXPENSES <br />1 16 <br />1 01 <br />01 <br />482 <br />1 2,070 <br />1 01 <br />01 <br />01 <br />1,400 <br />1 3,968 <br />FUND SOURCES <br />Awarded STP Grant <br />189 <br />438 <br />+ 1 <br />627 <br />Proposed TIB Grant <br />155 <br />1,189 <br />W F, <br />1,200 <br />2,544 <br />Mitigation Actual <br />S <br />T/rbrb Or <br />^s� <br />s teos <br />1 <br />1 <br />1 <br />0 <br />Traffic Impact Fees <br />128 <br />122 <br />1 <br />1 <br />m <br />250 <br />City Oper. Revenue <br />16 <br />0 <br />0 <br />10 <br />321 <br />0 <br />0 <br />0 <br />200 <br />547 <br />TOTAL SOURCES <br />16 <br />01 <br />01 <br />482 1 <br />2,070 1 <br />01 <br />01 <br />01 <br />1,400 1 <br />3,968 <br />2017 - 2022 Capital Improvement Program 26 <br />62 <br />Project Location, <br />y <br />Si565t <br />Sts St h� <br />� <br />` <br />�q <br />Twiwiy <br />1 <br />\, <br />_ steo st <br />5 1 <br />l� <br />1 <br />1 <br />__f <br />q Trec Or <br />� 1 <br />4 <br />� <br />3� <br />upr.,w a <br />+ 1 <br />♦ <br />W F, <br />1 <br />S <br />T/rbrb Or <br />^s� <br />s teos <br />1 <br />1 <br />1 <br />1 <br />1 <br />m <br />2017 - 2022 Capital Improvement Program 26 <br />62 <br />
The URL can be used to link to this page
Your browser does not support the video tag.