City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
TIC 2017-07-25 Item 2B - Contract Supplement #17 - Baker Boulevard Non-Motorized Improvements with Icon Materials
COT-City
>
City Clerk
>
Council Committees
>
Transportation and Infrastructure (2017-2020)
>
Transportation and Infrastructure Agenda Packets (2017-Present)
>
2017-07-25 Transportation and Infrastrcuture
>
TIC 2017-07-25 Item 2B - Contract Supplement #17 - Baker Boulevard Non-Motorized Improvements with Icon Materials
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2021 12:29:51 PM
Creation date
7/20/2017 9:53:10 AM
Metadata
Fields
Template:
Council Committees
Committees Date (mm/dd/yy)
07/25/17
Committee Name
Transportation and Infrastructure 2017-2020
Record Type
Agenda Packet
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF TUKWILA CAPITAL PROJECT SUMMARY <br />2017 to 2022 <br />PROJECT: Baker Blvd Non - Motorized Improvements Project No. 91610409 <br />Design and construct non - motorized improvements on Baker Blvd from Andover Park West to Christensen Rd, <br />DESCRIPTION: including bike lanes with a proposed road diet. Project will also construct previously designed non - motorized <br />improvement on Christensen Rd from Baker Blvd to the Green River trail. <br />JUSTIFICATION: Improve non - motorized connections between the Tukwila Transit Center and Tukwila Station. <br />STATUS: New project for the 2017 - 2022 CIP. <br />MAINT. IMPACT: Minimal impact, project includes new sidewalk trail and pavement markings. <br />COMMENT: Project is a component of the TUC/TOD Pedestrian Improvements. Grant funding by the King County Dept <br />of Natural Resources and Parks. <br />FINANCIAL Through Estimated <br />/in 5000'c1 2015 2016 2017 2018 2019 2020 2021 2022 BEYOND TOTAL <br />EXPENSES <br />T <br />— - -- <br />S I 8, I • "4' <br />1 <br />s iso s• � `4 .�4w s i <br />� 1 <br />j� <br />Design <br />> 1 <br />100 <br />1 <br />100 <br />Land (R/W) <br />_ <br />um..ea i I <br />1 <br />0 <br />Const. Mgmt. <br />120 <br />I1 <br />120 <br />Construction <br />780 <br />k <br />1 <br />780 <br />TOTAL EXPENSES <br />1 01 <br />01 <br />1,000 <br />1 01 <br />01 <br />01 <br />01 <br />01 <br />01 <br />1,000 <br />FUND SOURCES <br />Awarded Grant <br />0 <br />King County <br />1,000 <br />1,000 <br />Mitigation Actual <br />0 <br />Traffic Impact Fees <br />0 <br />City Oper. Revenue <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />TOTAL SOURCES <br />1 0 <br />0 <br />1,000 <br />1 0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />1 1,000 <br />Project Location <br />T <br />— - -- <br />S I 8, I • "4' <br />1 <br />s iso s• � `4 .�4w s i <br />� 1 <br />j� <br />> 1 <br />1 <br />a � I <br />_ <br />um..ea i I <br />1 <br />$ s,sos / <br />I1 <br />k <br />1 <br />2017 - 2022 Capital Improvement Program 15 <br />6 <br />