City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
TIC 2017-08-15 Item 2B - Agreement - 2018 Overlay and Repair Program Design with KPG Inc
COT-City
>
City Clerk
>
Council Committees
>
Transportation and Infrastructure (2017-2020)
>
Transportation and Infrastructure Agenda Packets (2017-Present)
>
2017-08-15 Transportation and Infrastructure
>
TIC 2017-08-15 Item 2B - Agreement - 2018 Overlay and Repair Program Design with KPG Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2021 12:29:51 PM
Creation date
8/10/2017 10:13:12 AM
Metadata
Fields
Template:
Council Committees
Committees Date (mm/dd/yy)
08/15/17
Committee Name
Transportation and Infrastructure 2017-2020
Record Type
Agenda Packet
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Assumptions for the 2018 Overlay Program Bid Package <br />Roadway and utility casting mapping will be based on aerial photography, GIS, <br />and field reviews by the Consultant. Topographic field survey may be required <br />for ADA ramp improvements and will be performed by the Consultant as <br />required. <br />Typically, only surface utilities requiring adjustment to grade will be shown. <br />No utility upgrades are anticipated in the project design. <br />Drainage & Water Quality Reports will not be required. <br />Geotechnical Engineering services will be required for West Marginal Place <br />subgrade requirements only. <br />Environmental Documentation will not be required. <br />Deliverables <br />90% review submittal with Plans, Specifications, and Estimate (6 copies) <br />Routing of 90% Plans to utilities for review and comment. <br />Bid Documents and Engineer's Estimate for 2018 Overlay Program <br />10 sets of Plans (11" X 17") and specifications for the Bid Documents. <br />Coordinate upload of Plans and Specifications to Builders Exchange. <br />Bid Analysis and recommendation for award. <br />SCOPE OF WORK <br />TASK 1 — 2018 OVERLAY PROGRAM <br />1.1 The Consultant shall provide continuous project management and administration for <br />the duration of the Project. (Estimate 6 months). <br />• Hold project coordination meetings with the City to update progress and <br />review submittals. Assume (4) meetings. <br />• The Consultant shall provide monthly status reports and billings. <br />• The Consultant shall provide independent QA/QC reviews by senior in- <br />house staff of all deliverables prior to submittal to the City. <br />1.2 The Consultant shall field review base maps that were prepared in 2017 for accuracy. <br />Topographic survey will be utilized only at ADA ramp locations where and complex <br />channelization only on S l33rd Street and Southcenter Parkway. <br />1.3The Consultant shall prepare 90% and final Plans for the proposed improvements <br />including the following: <br />City of Tukwila <br />2018 Overlay Program Page 2 of 4 <br />KPG, Inc, <br />August 2017 <br />29 <br />
The URL can be used to link to this page
Your browser does not support the video tag.