City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
TIC 2017-08-15 Item 2B - Agreement - 2018 Overlay and Repair Program Design with KPG Inc
COT-City
>
City Clerk
>
Council Committees
>
Transportation and Infrastructure (2017-2020)
>
Transportation and Infrastructure Agenda Packets (2017-Present)
>
2017-08-15 Transportation and Infrastructure
>
TIC 2017-08-15 Item 2B - Agreement - 2018 Overlay and Repair Program Design with KPG Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2021 12:29:51 PM
Creation date
8/10/2017 10:13:12 AM
Metadata
Fields
Template:
Council Committees
Committees Date (mm/dd/yy)
08/15/17
Committee Name
Transportation and Infrastructure 2017-2020
Record Type
Agenda Packet
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
HOUR AND FEE ESTIMATE <br />Project: City of Tukwila <br />2017 Overlay Program <br />EXHIBIT B <br />I PG <br />• Arch ic.ettare * <br />Landscapit A rehitcc*c** <br />• eikail Engirt., -ring * <br />Task <br />Description <br />Labor Hour Estimate <br />Total Fee <br />Project I Senior <br />Manager Engineer <br />$ 182.01 I 5 145.83 <br />Project Design i1 CAD <br />i <br />Engineer Engineer Technician <br />$ 119.33 I 5 103.69 1 S 87.97 <br />Const j Survey <br />Inspector Crew <br />104.80 ! $ 165.47 <br />Senior <br />Admin <br />$ 112.71 <br />Office <br />Admin <br />$ 58.11 <br />Fee <br />Task 1 - 2017 Overlay Pro ram <br />1.1 <br />Management and administration (estimate 6 months) <br />8 <br />8 <br />o <br />a <br />24 <br />0 <br />0 <br />20 <br />0 <br />10 <br />0MEM0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />6 <br />0 <br />0 <br />85 <br />0 <br />16 <br />2,597.27 <br />; 13356.58 <br />S 35,182.19 <br />1,2 <br />Prepare Project Base Maps <br />2 <br />1 <br />8 <br />8 <br />40 <br />1.3 <br />Prepare 90% and Final Plans <br />16 <br />F <br />40 <br />100 <br />80 <br />60 <br />, <br />1,4 <br />Project Cost Estimates (90%, Final) <br />4 <br />8 <br />16 <br />24 <br />16J <br />05 <br />4 <br />7,700.22 <br />1.5 <br />Project Specifications <br />4 <br />24 <br />16 <br />24 <br />0 <br />16 <br />8 <br />4 <br />0 <br />0 <br />0 <br />8 <br />8,75 .06 <br />1.6 <br />Utility Coordination <br />2 <br />1 <br />4 <br />40 <br />8 <br />8 <br />0 <br />0 <br />0 <br />4 <br />1 <br />7,485.34 <br />1.7 <br />Project Advertisement and Award <br />4 <br />4 <br />12 <br />12 <br />8 <br />0 <br />0 <br />0 <br />4 <br />Reimbursable - Mileage <br />, <br />1 <br />. 0 <br />Reimbursable - Reproduction <br />1,500E00 <br />Reimbursable - Geotechnical Review <br />i <br />20.000,00 <br />Reimbursable - Traffic Control <br />2,500_00 <br />Task Total <br />40 <br />80 I <br />200 <br />i <br />180 <br />120 <br />0 <br />30 <br />6 <br />40 <br />101,902.28 <br />Task 2 - Fort Dent Parking I Access Repairs <br />2.1 Alt analysis / Prepare plans, specs and estimate <br />4 <br />1 <br />8 <br />40 <br />24 <br />24 1 <br />0 <br />0 <br />2 <br />I 4 <br />I. $ 11,725.79 <br />Reimbursable - Mileage <br />1 $ 50.00 <br />Reimbursable - Reproductioni <br />S 25.00 <br />Task Total <br />4 <br />1 <br />8 <br />40 <br />. <br />1 <br />24 <br />i <br />24 <br />0 <br />0 <br />2 <br />4 <br />. <br />1 $ 11,800.79 <br />Total Estimated Fee: $ i13703.07 <br />8/1/2017 <br />
The URL can be used to link to this page
Your browser does not support the video tag.