City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
TIC 2017-08-15 Item 2B - Agreement - 2018 Overlay and Repair Program Design with KPG Inc
COT-City
>
City Clerk
>
Council Committees
>
Transportation and Infrastructure (2017-2020)
>
Transportation and Infrastructure Agenda Packets (2017-Present)
>
2017-08-15 Transportation and Infrastructure
>
TIC 2017-08-15 Item 2B - Agreement - 2018 Overlay and Repair Program Design with KPG Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2021 12:29:51 PM
Creation date
8/10/2017 10:13:12 AM
Metadata
Fields
Template:
Council Committees
Committees Date (mm/dd/yy)
08/15/17
Committee Name
Transportation and Infrastructure 2017-2020
Record Type
Agenda Packet
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF TUK I A CAPITAL PROJECT SUMMARY <br />2017 to 2022 <br />PROJECT: Annual Overlay and Repair Program Project No 9xx10401 <br />DESCRIPTION: Select, design and construct asphalt and concrete pavement overlays of arterial and residential streets, <br />JUSTIFICATION: Preserve and maintain the street structure in a safe and useable state by resurfacing before failure which also <br />minimizes costs. Some individual sites may be coordinated with water, sewer, and surface water projects. <br />STATUS: Each year various sections of roadway throughout the City are designed and constructed for asphalt overlay <br />MAINT. IMPACT: Reduces annual maintenance <br />COMMENT: <br />FINANCIAL <br />(in $000's) <br />Ongoing project, Only one year actuals shown in first column <br />Through Estimated <br />2015 2016 2 <br />7 <br />2018 <br />2019 <br />2020 <br />2021 <br />2022 <br />BEYOND TOTAL <br />EXPENSES <br />Design <br />123 <br />135 <br />150 <br />150 <br />175 <br />175 <br />200 <br />200 <br />200 <br />1,608 <br />Land (R/VV) <br />0 <br />Const Mgmt. <br />276 <br />175 <br />200 <br />200 <br />225 <br />225 <br />250 <br />250 <br />275 <br />2,076 <br />Construction <br />1,289 <br />1,260 <br />1,050 <br />1,050 <br />1,330 <br />1,340 <br />1,350 <br />1,350 <br />1,375 <br />11,394 <br />TOTAL EXPENSES <br />1,688 <br />1,570 <br />1,400 <br />1,400 <br />1,730 <br />1,740 <br />1,800 <br />1,800 <br />1,850 <br />14,978 <br />FUND SOURCES <br />Awarded Grant <br />0 <br />Proposed Grant <br />0 <br />Mitigation Actual <br />0 <br />Mitigation Expected <br />0 <br />City Oper. Revenue <br />1,688 <br />1,570 <br />1.400 <br />1,400 <br />1,730 <br />1,740 <br />1,800 <br />1,800 <br />1,850 <br />14,978 <br />TOTAL SOURCES <br />1,688 <br />1,570 <br />1,400 <br />1,400 <br />1,730 <br />1,740 <br />1,800 <br />1,800 <br />1,850 <br />14,978 <br />2017 - 2022 Capital improvement Program <br />18 <br />22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.