City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
FIN 2017-09-06 Item 2A - Report - Public Safety Bond Financial Oversight Committee
COT-City
>
City Clerk
>
Council Committees
>
Finance (2017-2020)
>
Finance Agenda Packets (2017-Present)
>
2017-09-06 Finance
>
FIN 2017-09-06 Item 2A - Report - Public Safety Bond Financial Oversight Committee
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2021 12:13:06 PM
Creation date
8/31/2017 3:06:42 PM
Metadata
Fields
Template:
Council Committees
Committees Date (mm/dd/yy)
09/06/17
Committee Name
Finance 2017-2020
Record Type
Agenda Packet
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
3. How does the City plan to control costs for the construction of the buildings? <br />Construction of the fire stations and the justice center will be procured using the general <br />contractor/construction manager procedure described in RCW 39.10.340 thru .410. Proposing <br />GC/CM firms that reach the final selection stage will submit their price for their fee and general <br />conditions costs. Those will be factored into the final selection according too formula detailed in <br />the RFP. Except for the possible utilization (if there's a clear benefit) of the alternative electrical <br />and/or mechanical procurement procedure described in RCW 39.10.385, all work scopes on <br />those projects will be competitively bid pursuant to the statute. The City's executive team has <br />ext?nsive experience successfully managing GC/CM projects, with cost and schedule control of <br />paramount importance. <br />http://app.leg. wa. gov/RCW/default. aspx?cite=39.10.340 <br />http://app.leg. wa.gov/RCWldefault.aspx?cite=39.10.385 <br />Construction of the combined shops may be procured using the design/build procedure described <br />in RCW 39.10.300 thru .330, but only if there's a clear benefit. That decision will be made <br />sometime next year. <br />http://app.leg. wa.gov/RCW/default.aspx?cite=39.10.300 <br />10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.