Laserfiche WebLink
3. How does the City plan to control costs for the construction of the buildings? <br />Construction of the fire stations and the justice center will be procured using the general <br />contractor/construction manager procedure described in RCW 39.10.340 thru .410. Proposing <br />GC/CM firms that reach the final selection stage will submit their price for their fee and general <br />conditions costs. Those will be factored into the final selection according too formula detailed in <br />the RFP. Except for the possible utilization (if there's a clear benefit) of the alternative electrical <br />and/or mechanical procurement procedure described in RCW 39.10.385, all work scopes on <br />those projects will be competitively bid pursuant to the statute. The City's executive team has <br />ext?nsive experience successfully managing GC/CM projects, with cost and schedule control of <br />paramount importance. <br />http://app.leg. wa. gov/RCW/default. aspx?cite=39.10.340 <br />http://app.leg. wa.gov/RCWldefault.aspx?cite=39.10.385 <br />Construction of the combined shops may be procured using the design/build procedure described <br />in RCW 39.10.300 thru .330, but only if there's a clear benefit. That decision will be made <br />sometime next year. <br />http://app.leg. wa.gov/RCW/default.aspx?cite=39.10.300 <br />10 <br />