City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
TIC 2017-09-12 COMPLETE AGENDA PACKET
COT-City
>
City Clerk
>
Council Committees
>
Transportation and Infrastructure (2017-2020)
>
Transportation and Infrastructure Agenda Packets (2017-Present)
>
2017-09-12 Transportation and Infrastructure
>
TIC 2017-09-12 COMPLETE AGENDA PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2021 12:29:52 PM
Creation date
9/7/2017 1:02:09 PM
Metadata
Fields
Template:
Council Committees
Committees Date (mm/dd/yy)
09/12/17
Committee Name
Transportation and Infrastructure 2017-2020
Record Type
Agenda Packet
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
209
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
TO: <br />IW ROM: <br />BY: <br />CC: <br />DATE, <br />9 <br />Public Works Department - Bob Giberson, Director <br />Transportation and Infrastructure Committ <br />Bob Giberson, Public Works Directorl <br />Mike Cusick, Senior Program Manager <br />Mayor Ekberg <br />September 8, 2017 <br />SUBJECT: glg IllygLitgLy gf the M&ter-S <br />, atem <br />Project No. 81640104 <br />Consultant Selection and Agreement for 2017 <br />Allan Ekberg, Mayor <br />ISSUE <br />Approve David Evans and Associates, Inc. (DEA) for the GIS inventory of the Tukwila Water <br />System, <br />Z A• <br />The contract for the GIS Inventory of the Water System will start in the Commercial Business <br />District. It will be the first phase of surveying the Tukwila Water system, The GIS survey project <br />will continue through the year 2022 with data being used to create an asset management <br />database for the water system. This project will build on the existing GIS databases that <br />currently exist for the sewer and storm drainage systems. <br />The City invited Requests for Professional Qualifications (RPQ) from five consulting firms that <br />were listed in the Municipal Research and Services Center's Consultant Roster. Three RPQs <br />were received; from DEA, PACE Engineers, and Gray & Osborn Engineering. After interviewing <br />the consultants and reviewing their RPQs, DEA was selected for the GIS Inventory of the Water <br />System. DEA has completed other design projects for the City and their work has been <br />satisfactory, <br />Consultant Budget for <br />Agreement 2017 <br />GIS Inventory of Water $–x10-03 $67M�OQ <br />10*410pm I W9 <br />Council is being asked to approve the consultant agreement with David Evans and Associates, <br />Inc. for the GIS Inventory of the Water System in the amount of $59,916.03 and consider this <br />item on the Consent Agenda at the September 18, 2017 Regular Meeting. <br />Attachments: Consultant Rating Sheet <br />Page 70, 2017-2022 C I P <br />Consultant Agreement with Scope of Werk <br />W)PW EngI13R0.11EGMA- WT Projectr,\2017 Water GIS (91640104)kInfo Merno GIS Water DEA 0910817 twaaex <br />
The URL can be used to link to this page
Your browser does not support the video tag.