City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
TIC 2017-09-12 COMPLETE AGENDA PACKET
COT-City
>
City Clerk
>
Council Committees
>
Transportation and Infrastructure (2017-2020)
>
Transportation and Infrastructure Agenda Packets (2017-Present)
>
2017-09-12 Transportation and Infrastructure
>
TIC 2017-09-12 COMPLETE AGENDA PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2021 12:29:52 PM
Creation date
9/7/2017 1:02:09 PM
Metadata
Fields
Template:
Council Committees
Committees Date (mm/dd/yy)
09/12/17
Committee Name
Transportation and Infrastructure 2017-2020
Record Type
Agenda Packet
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
209
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CON of Tukwila Contract Number: <br />6200 Southcenter Boulevard, Tukwila WA 98188 <br />1111111111111:11Z lei 10 1;3-4VUM114* I <br />THIS AGREEMENT is entered into between the City of Tukwila, Washington, hereinafter <br />referred to as "the City", and David Evans Associates,inc hereinafter referred to as "the Consultant", <br />in consideration of the mutual benefits, terms, and conditions hereinafter specified. <br />1. Proiect Designation. The Consultant is retained by the City to perform Engineering <br />Services in connection with the project titled GIS Inventory of Water System, <br />Z Sc2pe of Services. The Consultant agrees to perform the services, identified on Exhibit "A" <br />attached hereto, including the provision of all labor, materials, equipment and supplies. <br />31 Duration of Agreernent;Tire for Performance. This Agreement shall be in full force and <br />effect for a period commencing upon execution and ending unless <br />sooner terminated under the provisions hereinafter specified, Work under this Agreement <br />shall commence upon written notice by the City to the Consultant to proceed. The <br />Consultant shall perform all services and provide all work product required pursuant to this <br />Agreement no later than March 31, 2018 unless an extension of such time is granted in <br />writing by the City. <br />4. Payment. The Consultant shall be paid by the City for completed work and for services <br />rendered under this Agreement as follows: <br />A. Payment for the work provided by the Consultant shall be made as provided on Exhibit <br />"B" attached hereto, provided that the total amount of payment to the Consultant shall <br />not exceed $59,916.03 without express written modification of the Agreement signed by <br />the City. <br />B. The Consultant may submit vouchers to the City once per month during the progress of <br />the work for partial payment for that portion of the project completed to date. Such <br />vouchers will be checked by the City and, upon approval thereof, payment shall be <br />made to the Consultant in the amount approved. <br />C. Final payment of any balance due the Consultant of the total contract price earned will <br />be made promptly upon its ascertainment and verification by the City after the <br />completion of the work under this Agreement and its acceptance by the City. <br />D. Payment as provided in this section shall be full compensation for work performed, <br />services rendered, and for all materials, supplies, equipment and incidentals necessary <br />to complete the work. <br />E. The Consultant's records and accounts pertaining to this Agreement are to be kept <br />available for inspection by representatives of the City and the state of Washington for a <br />period of three (3) years after final payments. Copies shall be made available upon <br />request, <br />0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.