Laserfiche WebLink
PROJECT: <br />DESCRIPTION: <br />JUSTIFICATION: <br />STATUS: <br />MAINT. IMPACT: <br />COMMENT: <br />CITY OF TUKWILA CAPITAL PROJECT SUMMARY <br />2017 to 2022 <br />Water Reservoir and Pump Station Project No. 91240102 <br />Design and construct a new 1.5 million gallon water storage reservoir with a 3,300 gpm pump station. <br />The Department of Health is requiring that the City provide additional water storage in the 360 pressure zone, <br />which includes the Commercial Business District. A pump station is needed for fire flow. <br />Design funds in 2017 will study the possibility of using Highline's CrestView Reservoir's extra capacity instead of <br />building a new reservoir. Siting study in 2013 showed optimal site location in the Manufacturing/Industrial Center <br />(MIC). May also be included in new PW Shop facilities. <br />Additional staff will be needed to provide maintenance for the new reservoir and pumps. <br />The pump station may not be required depending on the location of the proposed reservoir. <br />FINANCIAL <br />(in $000's) <br />Through Estimated <br />2015 2016 2017 <br />2018 <br />2019 <br />2020 <br />2021 <br />2022 <br />BEYOND TOTAL <br />EXPENSES <br />Design <br />26 <br />50 <br />500 <br />500 <br />1,076 <br />Land (RAN) <br />100 <br />100 <br />Const. Mgmt. <br />400 <br />400 <br />800 <br />Construction <br />2,600 <br />2,600 <br />5,200 <br />TOTAL EXPENSES <br />26 <br />0 <br />50 <br />0 <br />600 <br />3,500 <br />3,000 <br />0 <br />0 <br />7,176 <br />FUND SOURCES <br />Awarded Grant <br />0 <br />Proposed Grant <br />0 <br />Bond <br />3,000 <br />3,000 <br />6,000 <br />Mitigation Expected <br />0 <br />Utility Revenue <br />26 <br />0 <br />50 <br />0 <br />600 <br />500 <br />0 <br />0 <br />0 <br />1,176 <br />TOTAL SOURCES <br />26 <br />0 <br />50 <br />0 <br />600 <br />3,500 <br />3,000 <br />0 <br />0 <br />7,176 <br />Location to be determined. <br />2017 - 2022 Capital Improvement Program 71 <br />3 <br />