City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
TIC 2017-10-24 Item 2B - Contract Amendment #3 - Fort Dent Park BNSF Sewer Relocation with KPFF Consulting Engineers
COT-City
>
City Clerk
>
Council Committees
>
Transportation and Infrastructure (2017-2020)
>
Transportation and Infrastructure Agenda Packets (2017-Present)
>
2017-10-24 Transportation and Infrastructure
>
TIC 2017-10-24 Item 2B - Contract Amendment #3 - Fort Dent Park BNSF Sewer Relocation with KPFF Consulting Engineers
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2021 12:29:54 PM
Creation date
10/19/2017 9:39:39 AM
Metadata
Fields
Template:
Council Committees
Committees Date (mm/dd/yy)
10/24/17
Committee Name
Transportation and Infrastructure 2017-2020
Record Type
Agenda Packet
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
2. Provide a cathodic protection system design (drawings and specification) to <br />supplement the protective coating. The design will provide corrosion control to <br />locations of coating damage that may occur during installation, including at welded <br />connections that may not be coated. It is anticipated that the system will utilize <br />galvanic anodes which will not require external power. This installation of the <br />coating and cathodic protection system will add an estimated 30 years to the useful <br />life of the casing. <br />3. Provide a review of final project documents. <br />4. The design documents will be submitted in .pdf, .docx, and .dwg format. <br />BUDGET/SCHEDULE <br />The tasks associated with the design portion of this proposal are estimated to be <br />$5,745.97. All work will be billed on a time and materials basis in accordance with the <br />attached cost breakout. <br />SCOPE: TIME FOR PROJECT COMPLETION <br />The time for completion of the project is extended from December 31, 2017 to December <br />31, 2018. <br />All other provisions of the contract shall remain in full force and effect. <br />PAYMENT: SHALL BE AS FOLLOWS <br />Payment for the work provided by the Consultant as part of this supplement shall be made <br />for an additional $7,876.20. The total amount for the Consultant for this contract shall not <br />exceed $164,753.20 without express written modification of the Agreement signed by the <br />City. <br />Dated this <br />day of , 20 <br />CITY OF TUKWILA CONSULTANT <br />Allan Ekberg, Mayor Printed Name: PA-R.?:r Stc.� <br />ATTEST/AUTHENTICATED APPROVED AS TO FORM <br />Christy O'Flaherty, MMC, City Clerk City Attorney <br />Page 2 of 2 <br />16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.