Laserfiche WebLink
ADU Changes <br />SurveyMonkey <br />Q4 Should the City allow attached ADUs to be up to half the square <br />footage of the house rather than the current limit of one third? <br />Answered: 159 Skipped: 6 <br />Yes - make the <br />change <br />No - keep this <br />the same <br />ANSWER CHOICES <br />Yes - make the change <br />No - keep this the same <br />TOTAL <br />\\IINI\110 <br />000\\\\0 <br />0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% <br />RESPONSES <br />60.38% <br />39.62% <br /># OTHER (PLEASE SPECIFY) <br />1 Pay extra costs <br />2 If it meets other lot dimension requirements <br />3 Depends on how big the house and lot is. <br />4 Not sure - maybe up to half with a cap on the total sq. ft. <br />5 Is the City worried about over crowding when it is building a monstrosity of a low income housing <br />unit near the SouthCenter Mall? <br />6 AUDs should be allowed up half the sq footage of the main house <br />7 Only If the ADU is on a 7200SF lot, then and only then could ADU be 1000SF. <br />8 Yes, up to 800 sf max <br />9 This creates a duplex. <br />10 a single amount seems better, so an adu could be the limit of 800 square feet <br />11 Lot size should be a factor making sure the structure does not cover the entire lot. Scale scale a <br />consideration. <br />12 Most homes would not allow up to half of the square footage, but for those that can, we feel it <br />should be allowed. <br />24 <br />4/15 <br />DATE <br />8/1/2017 4:08 PM <br />7/26/2017 7:49 AM <br />7/25/2017 6:22 PM <br />7/22/2017 12:11 PM <br />7/21/2017 4:07 PM <br />7/20/2017 7:42 PM <br />7/20/2017 6:10 PM <br />7/18/2017 9:34 PM <br />7/18/2017 5:46 PM <br />7/17/2017 4:30 PM <br />7/17/2017 4:00 PM <br />7/13/2017 11:41 AM <br />96 <br />63 <br />159 <br />