City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
TIC 2017-11-14 Item 2C - Agreement - Martin Luther King Jr Way South Water Main Design with Carollo Engineers
COT-City
>
City Clerk
>
Council Committees
>
Transportation and Infrastructure (2017-2020)
>
Transportation and Infrastructure Agenda Packets (2017-Present)
>
2017-11-14 Transportation and Infrastructure
>
TIC 2017-11-14 Item 2C - Agreement - Martin Luther King Jr Way South Water Main Design with Carollo Engineers
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2021 12:29:55 PM
Creation date
11/7/2017 4:27:21 PM
Metadata
Fields
Template:
Council Committees
Committees Date (mm/dd/yy)
11/14/17
Committee Name
Transportation and Infrastructure 2017-2020
Record Type
Agenda Packet
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of Tukwila <br />Public Works Department - Bob Giberson, Director <br />INFORMATIONAL MEMORANDUM <br />TO: Transportation and Infrastructure Committee <br />FROM: Robin Tischmak, Acting Public Works Director <br />BY: Mike Cusick, Senior Program Manager <br />CC: Mayor Ekberg <br />DATE: November 9, 2017 <br />SUBJECT: Martin Luther King Jr Way S Water Main <br />Project No. 90640102 <br />Design Consultant Selection and Agreement for 2017 <br />Allan Ekberg, Mayor <br />ISSUE <br />Approve Carollo Engineers for the design of the Martin Luther King (MLK) Way S Water Main <br />Project. <br />BACKGROUND <br />During the construction of Sound Transit's light rail along MLK Way S, the existing 12" D.I.P. <br />watermain was found to be heavily covered in corrosion and in need of being replaced or <br />relined. <br />ANALYSIS & FISCAL IMPACT <br />The City invited Requests for Professional Qualifications from five consulting firms that were <br />listed in the Municipal Research and Services Center's Consultant Roster. Only two RPQ's <br />were received for the project from Carollo Engineers and PACE Engineers. After reviewing the <br />RPQ'S, Carollo Engineers was selected to design the MLK Way S Water Main Project. Carollo <br />Engineers has completed other design projects for the City and their work has been <br />satisfactory. <br />Consultant Design <br />Agreement Budget <br />Martin Luther King Jr. Way S Water Main Design $ 69,967.00 70,000.00 <br />RECOMMENDATION <br />Council is being asked to approve the consultant agreement with for Carollo Engineers for the <br />design of the Martin Luther King Jr. Way S Water Main Project in the amount of $69,967.00 and <br />consider this item on the Consent Agenda at the November 20, 2017 Regular Meeting. <br />Attachments: Consultant Rating Sheet <br />Page 69, 2017 CIP <br />Consultant Agreement with Scope of Work <br />W:\PW Eng\PROJECTS \A- WT Projects\MLK WATERLINE (90640102)1INFO MEMO mlk watermain OCT 26 2017 SM.docx <br />71 <br />
The URL can be used to link to this page
Your browser does not support the video tag.