City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
TIC 2017-11-14 Item 2C - Agreement - Martin Luther King Jr Way South Water Main Design with Carollo Engineers
COT-City
>
City Clerk
>
Council Committees
>
Transportation and Infrastructure (2017-2020)
>
Transportation and Infrastructure Agenda Packets (2017-Present)
>
2017-11-14 Transportation and Infrastructure
>
TIC 2017-11-14 Item 2C - Agreement - Martin Luther King Jr Way South Water Main Design with Carollo Engineers
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2021 12:29:55 PM
Creation date
11/7/2017 4:27:21 PM
Metadata
Fields
Template:
Council Committees
Committees Date (mm/dd/yy)
11/14/17
Committee Name
Transportation and Infrastructure 2017-2020
Record Type
Agenda Packet
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF TUKWILA CAPITAL PROJECT SUMMARY <br />2017 to 2022 <br />PROJECT: Martin Luther King Jr Way S Water Main Project No. 90640102 <br />DESCRIPTION: Design and construct replacement of 800 LF of 12" water line and hydrants. <br />JUSTIFICATION: During the construction of Sound Transit light rail along Martin Luther King Jr Way South, the existing <br />12" D.I.P. waterline was found to be heavily covered with corrosion. <br />STATUS: Design will begin in 2017 with construction in 2018. <br />MAINT. IMPACT: A relined pipe will reduce the risk of failure. <br />COMMENT: Project will require a franchise agreement with WSDOT for existing waterline located in WSDOT right-of-way. <br />FINANCIAL Through Estimated <br />in $000's <br />2015 2016 2017 <br />2018 <br />2019 <br />202 <br />2022 <br />EXPENSES <br />Project Location <br />S , , <br />N <br />\\\ GJ Q <br />Boetn <br />a <br />} <br />Design <br />1 <br />70 <br />, , y <br />co <br />N <br />71 <br />Land (RAN) <br />111, <br />�flfl s11.st <br />W1 <br />D > <br />to <br />\,) <br />A� <br />w Str <br />4`0 <br />-,s, <br />0 <br />Const. Mgmt. <br />w <br />N <br />w�.b <br />S 12: <br />t� <br />40 <br />40 <br />80 <br />Construction <br />GIS <br />V ' a <br />° � <br />273 <br />116 <br />389 <br />TOTAL EXPENSES <br />1 <br />0 <br />70 <br />313 <br />156 <br />0 <br />0 <br />0 <br />0 <br />540 <br />FUND SOURCES <br />Awarded Grant <br />0 <br />Proposed Grant <br />0 <br />Mitigation Actual <br />0 <br />Mitigation Expected <br />0 <br />Utility Revenue <br />1 <br />0 <br />70 <br />313 <br />156 <br />0 <br />0 <br />0 <br />0 <br />540 <br />TOTAL SOURCES <br />1 <br />0 <br />70 <br />313 <br />156 <br />0 <br />0 <br />0 <br />0 <br />540 <br />2017 - 2022 Capital Improvement Program <br />69 <br />73 <br />Project Location <br />S , , <br />N <br />\\\ GJ Q <br />Boetn <br />a <br />} <br />/ <br />y <br />S1 2 S <br />, , y <br />co <br />N <br />. a <br />111, <br />�flfl s11.st <br />W1 <br />D > <br />to <br />\,) <br />A� <br />w Str <br />4`0 <br />-,s, <br />w <br />N <br />w�.b <br />S 12: <br />t� <br />S 125 t <br />...�- <br />0 <br />GIS <br />V ' a <br />° � <br />2017 - 2022 Capital Improvement Program <br />69 <br />73 <br />
The URL can be used to link to this page
Your browser does not support the video tag.