Laserfiche WebLink
Members of the Planning Commission <br />Staff Report L17-0077, Revisions to TMC 18.06 Definitions, <br />and TMC 18.54, Tree Regulations <br />December 28, 2017 <br />DISCUSSION OF PROPOSED CHANGES <br />The Tukwila Tree and Environment Advisory Committee draft tree regulations (Attachments A and B) <br />and draft revisions to the Zoning Code's Definitions, TMC 18.06 (Attachment C) contains proposed <br />changes to the City's the Zoning Code. Below is a summary of each subsection of the draft Tree <br />Regulations and Definitions. <br />The proposed draft tree regulations and changes to definitions have been annotated to provide sources of <br />the material and to note when the Advisory Committee or Planning Commission made changes to the <br />initial staff draft. <br />A. Proposed Revisions to TMC 18.06, Definitions <br />A number of new definitions are proposed to be added to the Zoning Code to incorporate terminology <br />that is related to urban forestry and the management of the City's tree canopy resources. Many of the <br />proposed revisions are annotated to provide sources for the proposed changes. Proposed new definitions <br />include: at -risk tree, critical root zone, diameter at breast height (DBH), dripline, exceptional tree, <br />heritage tree or heritage grove, invasive plant and tree list, invasive tree, nuisance tree, pruning, <br />qualified tree professional, risk, site disturbance, street tree, target or risk target, tree risk assessment, <br />tree risk assessor, tree removal, topping, viable tree and windfirm. <br />B. Proposed TMC 18.54, Urban Forestry and Tree Regulations: <br />TMC 18.54.010. Purpose: The purpose section of the chapter has been expanded to add references to <br />the new Comprehensive Plan goals and policies related to urban forestry, and low impact development <br />and to recognize the benefits that trees provide to the built environment. <br />TMC 18.54.020: Scope: This subsection is a carry-over from the current regulations. <br />TMC 18.42.030. Tree Permit Required: Revisions to this subsection anticipate a variety of Tree <br />Permits, depending on whether: tree removal is the objective; or work will occur in the critical root <br />zone; a Heritage Tree is proposed for removal or more than 20% of existing crown is proposed for <br />pruning; or removal is related to utility work. The subsection also identifies activities that are exempt <br />from the need for a Tree Permit and when an arborist's report must be submitted as part of the Tree <br />Permit. <br />TMC 18.54.040. Permit Submittal Requirements: Most of this subsection is from existing Tree Code. <br />Single family tree removal is proposed to be regulated differently with a Tree Inventory Survey rather <br />than a Tree Permit required. <br />TMC 18.54.050. Permit Approval Criteria, General: This subsection has been revised to provide <br />general guidance on the criteria for permit approval. The criteria are then spelled out in more detail in <br />proposed TMC 18.54.060, 18.54.070, 18.54.080 and 18.54.110. <br />CL Page 4 of 6 1/2/2018 5:49 PM <br />W:A\Long Range Projects\2016 Landscaping and Tree Code Update\Draft Tree Regs\Planning Commission\Staff Rpt. Tree Code <br />48 <br />