City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
TIC 2018-01-22 Item 2C - Grant Acceptance - Transportation Improvement Board Grant for West Valley Highway (I-405 to Strander Bouelvard)
COT-City
>
City Clerk
>
Council Committees
>
Transportation and Infrastructure (2017-2020)
>
Transportation and Infrastructure Agenda Packets (2017-Present)
>
2018-01-22 Transportation and Infrastructure
>
TIC 2018-01-22 Item 2C - Grant Acceptance - Transportation Improvement Board Grant for West Valley Highway (I-405 to Strander Bouelvard)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2021 12:29:56 PM
Creation date
1/18/2018 12:36:53 PM
Metadata
Fields
Template:
Council Committees
Committees Date (mm/dd/yy)
01/22/18
Committee Name
Transportation and Infrastructure 2017-2020
Record Type
Agenda Packet
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
411111... <br />Washington State Transportation Improvement Board <br />Fuel Tax Grant Agreement <br />8-1-116(013)-1 <br />a) RECIPIENT is not making reasonable progress toward correction and <br />compliance. <br />b) TIB denies the RECIPIENT's request to amend the Project. <br />c) After investigation TIB confirms RECIPIENT'S non-compliance. <br />TIB reserves the right to order RECIPIENT to immediately stop work on the Project and <br />TIB may stop Project payments until the requested corrections have been made or the <br />Agreement has been terminated. <br />9.3 TERMINATION <br />a) In the event of default by the RECIPIENT as determined pursuant to Section 9.2, <br />TIB shall serve RECIPIENT with a written notice of termination of this Agreement, which <br />shall be served in person, by email or by certified letter. Upon service of notice of <br />termination, the RECIPIENT shall immediately stop work and/or take such action as may <br />be directed by TIB. <br />b) In the event of default and/or termination by either PARTY, the RECIPIENT may <br />be liable for damages as authorized by law including, but not limited to, repayment of <br />grant funds. <br />c) The rights and remedies of TIB provided in the AGREEMENT are not exclusive <br />and are in addition to any other rights and remedies provided by law. <br />9.4 TERMINATION FOR NECESSITY <br />TIB may, with ten (10) days written notice, terminate this Agreement, in whole or in part, <br />because funds are no longer available for the purpose of meeting TIB's obligations. If <br />this Agreement is so terminated, TIB shall be liable only for payment required under this <br />Agreement for performance rendered or costs incurred prior to the effective date of <br />termination. <br />10.0 USE OF TIB GRANT FUNDS <br />TIB grant funds come from Motor Vehicle Fuel Tax revenue. Any use of these funds for <br />anything other than highway or roadway system improvements is prohibited and shall subject <br />the RECIPIENT to the terms, conditions and remedies set forth in Section 9. If Right of Way is <br />purchased using TIB funds, and some or all of the Right of Way is subsequently sold, proceeds <br />from the sale must be deposited into the RECIPIENT's motor vehicle fund and used for a motor <br />vehicle purpose. <br />11.0 INCREASE OR DECREASE IN TIB GRANT FUNDS <br />At Bid Award and Contract Completion, RECIPIENT may request an increase in the TIB funds <br />for the specific project. Requests must be made in writing and will be considered by TIB and <br />awarded at the sole discretion of TIB. All increase requests must be made pursuant to WAC <br />479-05-202 and/or WAC 479-01-060. If an increase is denied, the recipient shall be liable for <br />costs incurred in excess of the grant amount. In the event that final costs related to the specific <br />project are less than the initial grant award, TIB funds will be decreased and/or refunded to TIB <br />in a manner that maintains the original ratio between TIB funds and total project costs. <br />Fuel Tax Agreement Page 3 of 5 November 2012 <br />37 <br />
The URL can be used to link to this page
Your browser does not support the video tag.