City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
TIC 2018-02-26 Item 2G - Contract Supplement #4 - 53rd Avenue South (South 137th Street - South 144th Street) Construction Management with KPG Inc
COT-City
>
City Clerk
>
Council Committees
>
Transportation and Infrastructure (2017-2020)
>
Transportation and Infrastructure Agenda Packets (2017-Present)
>
2018-02-26 Transportation and Infrastructure
>
TIC 2018-02-26 Item 2G - Contract Supplement #4 - 53rd Avenue South (South 137th Street - South 144th Street) Construction Management with KPG Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2021 12:29:57 PM
Creation date
2/22/2018 12:51:50 PM
Metadata
Fields
Template:
Council Committees
Committees Date (mm/dd/yy)
02/26/18
Committee Name
Transportation and Infrastructure 2017-2020
Record Type
Agenda Packet
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
EXHIBIT A-4 <br />Construction Management Services <br />Scope of Work <br />February 2018 <br />City of Tukwila <br />53rd Ave S (S 144th Street to S 137th Street) <br />Project No. 99110301 <br />TIB Project No.: 8-1-116(012)-1 <br />KPG Project #: 15085 <br />This work will provide construction management services for the construction contract to complete the <br />following; <br />Construction of approximately 2200 linear feet of street improvements within and outside of the right-of- <br />way of 53rd Ave S, including but not limited to construction of asphalt roadway, curb, gutter, planters, <br />and sidewalk; retaining walls; roadway excavation, and hot mix asphalt overlay; new storm conveyance <br />and treatment system; new utility water main; undergrounding of existing franchise utilities with joint <br />utility trench and service conversions; utility adjustments; illumination; landscaping; channelization and <br />signing; and other work necessary to complete the Work as specified and shown in the Contract <br />Documents. <br />A detailed scope for the Contract follows: <br />I. INTRODUCTION <br />The following scope of services and associated costs are based upon the assumptions outlined below. <br />General Assumptions: <br />• The proposed project team will include one part-time project manager, one resident engineer, <br />one documentation control specialist, one inspector, design team support as required, sub - <br />consultants to provide services for materials testing, and other supporting tasks as deemed <br />necessary. It is anticipated that full-time site observation will be required for the entire duration <br />of construction. <br />• The level of service is based on project duration of approximately 11 months, or 215 working days <br />with 10 days prior to construction and 10 days for closeout — total of 235 working days, 8 hour <br />days. <br />• It is anticipated that the client will review and execute the insurance, bonds, and the Construction <br />Contract. <br />City of Tukwila 53rd Ave S <br />Construction Management Services <br />Scope of Work <br />Page 1 of 9 <br />KPG <br />Project #15085 <br />February 2018 <br />40 <br />
The URL can be used to link to this page
Your browser does not support the video tag.