Laserfiche WebLink
d. Landscaping for the overall development including the commercial truck fueling area will <br />be achieved by using the new landscape Order #2523. Under Section 18.52.100 Request <br />for Landscape Modification Item A 2. Clustering and /or averaging of required <br />landscaping. Due to the needed maneuvering of the fueling truck on the site, the Southern <br />5' landscape setback/buffer along the I-5 off ramp will be averaged out in other areas of <br />the property. <br />e. A Photometric Study of the proposed lighting on site shows minimal off site impact of <br />our proposed light locations. <br />2. Relationship of Structure, Site and Building Design to Adjoining Area: <br />a. The design of the fueling canopy will be consistent with the 76 brand and matches the <br />uses both behind the convenience store as well as across 48th Ave. The design of the <br />convenience store and the materials proposed go well beyond the standard fueling station <br />convenience store look. From the different finish materials being used, the modulation of <br />the building facades to the roof and eave overhangs, the building will be aesthetically <br />appealing to the surrounding area as well as the people exiting I-5. The coffee kiosk will <br />also have this same building look and materials. <br />Pedro McCracken DESIGN GROUP, INC. <br />Duncan Wallace, Regional Manager <br />56 <br />