City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
TIC 2018-03-26 Item 2B - Contract Amendment #2 - GIS Services for Water, Sanitary Sewer and Surface Water
COT-City
>
City Clerk
>
Council Committees
>
Transportation and Infrastructure (2017-2020)
>
Transportation and Infrastructure Agenda Packets (2017-Present)
>
2018-03-26 Transportation and Infrastructure
>
TIC 2018-03-26 Item 2B - Contract Amendment #2 - GIS Services for Water, Sanitary Sewer and Surface Water
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2021 12:29:57 PM
Creation date
3/23/2018 10:15:41 AM
Metadata
Fields
Template:
Council Committees
Committees Date (mm/dd/yy)
03/26/18
Committee Name
Transportation and Infrastructure 2017-2020
Record Type
Agenda Packet
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
TASK 2M PROJECT MANAGEMENT AN <br />iI <br />QUALITY CONTROL <br />2.1 Project Management <br />CONSULTANT will provide direction for staff and review of their work over the course of the project. This <br />work element includes preparing monthly progress reports, to accompany monthly invoicing, that include <br />the status of individual work elements, number of meetings attended, outstanding information required, <br />and work items planned for the following month. <br />CONSULTANT will monitor the project budget weekly throughout the course of the project. This work <br />element is intended to help monitor costs and budgets, and to propose corrective actions, if needed. <br />These actions may include formal requests for increases, modifications, or reductions in scope. <br />Drawings and documents received and generated over the course of the project require review, <br />coordination, and file management. The status of requested information will also be maintained. <br />2.2 Monthly Invoices/Progress Reports <br />Monthly invoices will be prepared by CONSULTANT per CLIENT requirements for work activities for the <br />prior month. These invoices will include SUBCONSULTANT work and will be accompanied by monthly <br />progress reports, back-up materials for expenses, and show approved budget and amount expended to <br />date. <br />Deliverables: Monthly Invoices and Progress Reports (6 total). <br />2.3 Project Kick-off Meeting and Progress Meetings <br />After receiving notice to proceed, CONSULTANT will conduct a project team kick-off meeting with staff <br />expected to be involved in the project and key CLIENT staff. The meeting will be used to discuss critical <br />elements of the Scope of Work, the project schedule, document control, and QA/QC procedures; and to <br />clearly define the roles and responsibilities of the project team members. <br />This work element provides for the preparation, attendance, follow-up, and documentation of meetings <br />during the length of the project. These meetings will be the forums for CLIENT to provide input and <br />guidance for the direction of the project. They will also be used to discuss project issues, approve <br />submittals, and develop potential solutions. <br />CONSULTANT will prepare for, attend, and document up to six (6) meetings with CLIENT staff. The <br />CONSULTANT will attend one meeting every month with the CLIENT's project manager for the duration of <br />the project. The meetings will be held in a location acceptable to CLIENT and CONSULTANT. <br />Deliverables: Meeting Minutes (6 total). <br />2.4 Quality Assurance /Quality Control Review <br />This work element is for the QA/QC review of CONSULTANT deliverables by a designated QA/QC staff <br />member of the CONSULTANT team. CONSULTANT will assign a Quality Manager to the project that will <br />be responsible for ensuring that quality reviews are performed at stages throughout the project and on <br />all deliverables. The review will cover field and office work on an on-going basis. QA/QC documentation <br />will be maintained and filed with project records. <br />City of Tukwila <br />Water System GIS Inventory <br />Scope of Services <br />March 12, 2018 <br />40 <br />
The URL can be used to link to this page
Your browser does not support the video tag.