City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
TIC 2018-03-26 Item 2B - Contract Amendment #2 - GIS Services for Water, Sanitary Sewer and Surface Water
COT-City
>
City Clerk
>
Council Committees
>
Transportation and Infrastructure (2017-2020)
>
Transportation and Infrastructure Agenda Packets (2017-Present)
>
2018-03-26 Transportation and Infrastructure
>
TIC 2018-03-26 Item 2B - Contract Amendment #2 - GIS Services for Water, Sanitary Sewer and Surface Water
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2021 12:29:57 PM
Creation date
3/23/2018 10:15:41 AM
Metadata
Fields
Template:
Council Committees
Committees Date (mm/dd/yy)
03/26/18
Committee Name
Transportation and Infrastructure 2017-2020
Record Type
Agenda Packet
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF TUKWILA CAPITAL PROJECT SUMMARY <br />2017 to 2022 <br />PROJECT: GIS Inventory of Water System Project No. 91640104 <br />The GIS (Geographic Information System ) will provide current as -built data for the Tukwila water system. <br />DESCRIPTION: The data base will include fire hydrants, valve locations, approximate water line locations, date of installation, <br />and material type. <br />The GIS mapping will provide information on the water system that is easily addressable by City staff <br />JUSTIFICATION: and the public. With GIS data, the City will be able to develop an asset management plan to determine <br />the water assets needed to be upgraded or replaced. <br />STATUS: New project for 2017 - 2022 CIP. Combined Asset Management System scheduled for 2017. <br />MAINT. IMPACT: The survey will provide staff with -up -date information on the location of water line features. <br />COMMENT: <br />FINANCIAL Through Estimated <br />in $000's <br />2015 2016 2017 <br />2018 2019 2020 2021 2022 BEYOND TOTAL <br />EXPENSES <br />Design <br />67 <br />100 <br />100 <br />100 <br />100 <br />100 <br />567 <br />Land (RAN) <br />0 <br />Const. Mgmt. <br />0 <br />Construction <br />0 <br />TOTAL EXPENSES <br />0 <br />0 <br />67 <br />100 <br />100 <br />100 <br />100 <br />100 <br />0 <br />567 <br />FUND SOURCES <br />Awarded Grant <br />0 <br />Proposed Grant <br />0 <br />Mitigation Actual <br />0 <br />Mitigation Expected <br />0 <br />Utility Revenue <br />0 <br />0 <br />67 <br />100 <br />100 <br />100 <br />100 <br />100 <br />0 <br />567 <br />TOTAL SOURCES <br />0 <br />0 <br />67 <br />100 <br />100 <br />100 <br />100 <br />100 <br />0 <br />567 <br />Project Location: <br />Entire System <br />2017 - 2022 Capital Improvement Program <br />70 <br />33 <br />
The URL can be used to link to this page
Your browser does not support the video tag.