Laserfiche WebLink
EXHIBIT B <br />CITY OF TUKWILA <br />PRELIMINARY WATER RESERVOIR AND PUMP STATION FEASIBILITY STUDY <br />2/23/2018 <br />1 of 1 <br />2 <br />� <br />N <br />co <br />Q <br />ti;" <br />� <br />_ <br />C5 <br />OTHER DIRECT COSTS <br />TASK / DESCRIPTION <br />� <br />E 03 <br />c <br />c <br />c2o <br />a. <br />Total <br />Carollo <br />Travel <br />TOTAL <br />(13 a, <br />8 m E <br />" <br />E <br />`� - <br />m <br />a, <br />. <br />co <br />Hours <br />Labor <br />Cost <br />and PECE <br />COST <br />U E o <br />o <br />N o <br />Printing <br />a2Y 00 <br />0 - <br />Qain <br />off <br />U <br />Total <br />Total Labor Rate <br />$ 226 <br />$ 175 <br />$ 155 <br />$ 135 <br />$ 135 <br />$ 90 <br />$11.70 <br />ODC <br />Tasks <br />1 <br />Water Quality <br />2.0 <br />2.0 <br />8.0 <br />16.0 <br />0.0 <br />1.0 <br />29 <br />$ 4,292 <br />$ - $ 339 <br />$ 339 <br />$ 4,631 <br />2 <br />Purpose of Storage <br />4.0 <br />12.0 <br />8.0 <br />24.0 <br />2.0 <br />1.0 <br />51 <br />$ 7,844 <br />$ 15 $ 597 <br />$ 611 <br />$ 8,455 <br />3 <br />System Analysis <br />8.0 <br />16.0 <br />16.0 <br />80.0 <br />8.0 <br />1.0 <br />129 <br />$ 19,058 <br />$ 25 $ 1,509 <br />$ 1,534 <br />$ 20,592 <br />4 <br />TM No. 1 <br />4.0 <br />8.0 <br />4.0 <br />24.0 <br />8.0 <br />0.0 <br />48 <br />$ 7,244 <br />$ 100 $ 562 <br />$ 662 <br />$ 7,906 <br />5 <br />Project Managemer <br />4.0 <br />16.0 <br />0.0 <br />2.0 <br />0.0 <br />2.5 <br />25 <br />$ 4,199 <br />$ - $ 287 <br />$ 287 <br />$ 4,486 <br />Total <br />22.0 <br />54.0 <br />36.0 <br />146.0 <br />18.0 <br />5.5 <br />282 <br />42,637 <br />$ 140 $ 3,294 <br />$ 3,433 <br />$ 46,070 <br />2/23/2018 <br />1 of 1 <br />