City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
TIC 2018-04-09 Item 2A - Agreement - Water Reservoir and Pump Station Study with Carollo Engineers
COT-City
>
City Clerk
>
City Council Committees Meetings
>
Previous Committees
>
Transportation and Infrastructure (2017-2020)
>
Transportation and Infrastructure Agenda Packets (2017-2020)
>
2018 Transportation and Infrastructure Packets
>
2018-04-09 Transportation and Infrastructure
>
TIC 2018-04-09 Item 2A - Agreement - Water Reservoir and Pump Station Study with Carollo Engineers
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2021 12:29:58 PM
Creation date
4/5/2018 2:37:32 PM
Metadata
Fields
Template:
Council Committees
Committees Date (mm/dd/yy)
04/09/18
Committee Name
Transportation and Infrastructure 2017-2020
Record Type
Agenda Packet
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
EXHIBIT B <br />CITY OF TUKWILA <br />PRELIMINARY WATER RESERVOIR AND PUMP STATION FEASIBILITY STUDY <br />2/23/2018 <br />1 of 1 <br />2 <br />� <br />N <br />co <br />Q <br />ti;" <br />� <br />_ <br />C5 <br />OTHER DIRECT COSTS <br />TASK / DESCRIPTION <br />� <br />E 03 <br />c <br />c <br />c2o <br />a. <br />Total <br />Carollo <br />Travel <br />TOTAL <br />(13 a, <br />8 m E <br />" <br />E <br />`� - <br />m <br />a, <br />. <br />co <br />Hours <br />Labor <br />Cost <br />and PECE <br />COST <br />U E o <br />o <br />N o <br />Printing <br />a2Y 00 <br />0 - <br />Qain <br />off <br />U <br />Total <br />Total Labor Rate <br />$ 226 <br />$ 175 <br />$ 155 <br />$ 135 <br />$ 135 <br />$ 90 <br />$11.70 <br />ODC <br />Tasks <br />1 <br />Water Quality <br />2.0 <br />2.0 <br />8.0 <br />16.0 <br />0.0 <br />1.0 <br />29 <br />$ 4,292 <br />$ - $ 339 <br />$ 339 <br />$ 4,631 <br />2 <br />Purpose of Storage <br />4.0 <br />12.0 <br />8.0 <br />24.0 <br />2.0 <br />1.0 <br />51 <br />$ 7,844 <br />$ 15 $ 597 <br />$ 611 <br />$ 8,455 <br />3 <br />System Analysis <br />8.0 <br />16.0 <br />16.0 <br />80.0 <br />8.0 <br />1.0 <br />129 <br />$ 19,058 <br />$ 25 $ 1,509 <br />$ 1,534 <br />$ 20,592 <br />4 <br />TM No. 1 <br />4.0 <br />8.0 <br />4.0 <br />24.0 <br />8.0 <br />0.0 <br />48 <br />$ 7,244 <br />$ 100 $ 562 <br />$ 662 <br />$ 7,906 <br />5 <br />Project Managemer <br />4.0 <br />16.0 <br />0.0 <br />2.0 <br />0.0 <br />2.5 <br />25 <br />$ 4,199 <br />$ - $ 287 <br />$ 287 <br />$ 4,486 <br />Total <br />22.0 <br />54.0 <br />36.0 <br />146.0 <br />18.0 <br />5.5 <br />282 <br />42,637 <br />$ 140 $ 3,294 <br />$ 3,433 <br />$ 46,070 <br />2/23/2018 <br />1 of 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.