City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
TIC 2018-04-09 Item 2A - Agreement - Water Reservoir and Pump Station Study with Carollo Engineers
COT-City
>
City Clerk
>
City Council Committees Meetings
>
Previous Committees
>
Transportation and Infrastructure (2017-2020)
>
Transportation and Infrastructure Agenda Packets (2017-2020)
>
2018 Transportation and Infrastructure Packets
>
2018-04-09 Transportation and Infrastructure
>
TIC 2018-04-09 Item 2A - Agreement - Water Reservoir and Pump Station Study with Carollo Engineers
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2021 12:29:58 PM
Creation date
4/5/2018 2:37:32 PM
Metadata
Fields
Template:
Council Committees
Committees Date (mm/dd/yy)
04/09/18
Committee Name
Transportation and Infrastructure 2017-2020
Record Type
Agenda Packet
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Highline water district intertie <br />Water district 75 intertie <br />Water district #75 intertie <br />EXHIBIT A <br />CITY OF TUKWILA <br />PRELIMINARY WATER RESERVOIR AND PUMP STATION FEASIBILITY STUDY <br />The City of Tukwila (City) has proposed leasing storage from Highline Water District (Highline) <br />rather than construct a City owned 1.3 MG reservoir and pump station, which was identified in <br />the City's 2013 Comprehensive Water Plan. In 2014, the City and Carollo evaluated sites for a <br />City owned reservoir and identified Cerini Hill (abandoned SWAT training facility) as the <br />preferred location for the planned $7,180,000 reservoir and pump station. This study will <br />consider the operational and cost effectiveness of leasing storage from Highline. <br />• Carollo Engineers, Inc. will be referred to as "Consultant" in this document. <br />• City of Tukwila will be referred to as "City" in this document. <br />• Highline Water District will be referred to as "Highline" in this document. <br />• The City will obtain water quality on Highline's finished water quality in electronic format. <br />No water quality data will be collected. <br />• No new water quality data will be collected as part of the study. <br />• The 2013 Water System Plan hydraulic model will be used as the basis for the analysis. <br />• The City will obtain costs for leasing storage from Highline. <br />• All costs will be AACE Class V estimates. <br />TASKS <br />1. Summarize Water Quality - Summarize finished water quality from Highline and the City. It <br />is assumed the City will obtain the water quality data and provide it electronically. Compare <br />water quality to primary and secondary drinking water standards. No mixing study or <br />evaluating the corrosively either Highline or City water will be conducted as part of this work. <br />However, the data will be reviewed to confirm data availability for a future study. Additional <br />data collection will be recommended, if needed. <br />2. Purpose of Storage - Establish City's potential uses for the Highline reservoir (emergency <br />storage, fire storage, equalizing, etc.). Estimate the frequency of use, volume of storage and <br />flow rates required for each potential use. <br />o Meeting No. 1 — Storage Uses - Review water quality and identify storage uses for <br />leased reservoir with City staff. Establish criteria for hydraulic modeling and <br />comparison of alternatives. <br />o Meeting No. 3 — Highline Coordination - Meet with Highline Staff to discuss leasing <br />storage. Review purpose of uses, potential operations, and known infrastructure <br />challenges. Identify limitations by either Highline or the City. <br />3. System Analysis <br />o Update hydraulic model - Update the hydraulic model to incorporate piping changes <br />identified in the 2016 Pipeline Asset Management Update project. Develop potential <br />PRV settings for the Highline intertie based on the potential storage uses. Update <br />pw://Carollo/Documents/Client/WA/Tukwilaho933Aoo/Project Mgmt/Contracts/Tukwila Reservoir Analysis Scope of Work docx <br />Page 1 of 2 <br />8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.