City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
TIC 2018-04-23 Item 2C - Contract Supplement #1 - 2018 Overlay and Repair Program Construction Management with KPG Inc
COT-City
>
City Clerk
>
City Council Committees Meetings
>
Previous Committees
>
Transportation and Infrastructure (2017-2020)
>
Transportation and Infrastructure Agenda Packets (2017-2020)
>
2018 Transportation and Infrastructure Packets
>
2018-04-23 Transportation and Infrastructure
>
TIC 2018-04-23 Item 2C - Contract Supplement #1 - 2018 Overlay and Repair Program Construction Management with KPG Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2021 12:29:59 PM
Creation date
4/19/2018 3:58:40 PM
Metadata
Fields
Template:
Council Committees
Committees Date (mm/dd/yy)
04/23/18
Committee Name
Transportation and Infrastructure 2017-2020
Record Type
Agenda Packet
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Exhibit B-1 <br />Consultant Fee Determination <br />Project Name: 2018 Overlay Program <br />Supplement No. 1 - Construction Services <br />Consultant: KPG <br />COST PLUS FIXED FEE <br />Classification Hours Rate Cost <br />Project Manager 24 $ 81.32 $ 1,952 <br />Resident Engineer 240 $ 50.96 $ 12,230 <br />Project Engineer 64 $ 50.96 $ 3,261 <br />Design Engineer 16 $ 46.26 $ 740 <br />Engineering Technician 16 $ 37.59 $ 601 <br />Construction Inspector 480 $ 42.65 $ 20,470 <br />Survey Crew I 0 $ 59.63 $ - <br />Document Specialist 190 $ 40.48 $ 7,691 <br />Construction Admin 112 $ 33.25 $ 3,724 <br />Total Direct Salary Cost (DSC) <br />Overhead (146.70% x DSC) <br />Fixed Fee (30% x DSC) <br />1,142 <br />$50,669 <br />$74,330.83 <br />$15,200.58 <br />Subtotal: $140,200.00 <br />REIMBURSABLES <br />Construction Vehicle Mileage $1,000 <br />Miscellaneous - Repro, Field Supplies $1,000 <br />Subtotal: $2,000 <br />SUBCONSULTANT COSTS <br />Material Testing Allowance $25,000 <br />Subtotal: $25,000 <br />TOTAL $ 167,200.00 <br />19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.